Inspections for the day of: Tuesday, October 22, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-03688 Final10/18/200210/22/200210/22/2002 12:00:00 AMAPASS
###-#### final ok 10/22/2002 11:46:01 AM
PLM01-02665 Final10/18/200210/22/200210/22/2002 12:00:00 AMAPASS
###-#### final ok 10/22/2002 11:45:39 AM
PLM02-03191 Plumbing Rough-in10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 12:14:32. Contact: ###-####. r/i ok 10/22/2002 11:45:24 AM
PLM02-00944 Final10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
BILL THIS HAS BEEN FINALED, BUT THEY RECEIVED A CARD IN THE MAIL ...THANKS DARLA oops final ok 10/21/2002 1:56:56 PM
PLM02-00160 Final10/21/200210/22/200210/22/2002 12:00:00 AMANH
eddie with drake will call with access 10/22/2002 11:45:09 AM
PLM02-00906 Plumbing Rough-in10/21/200210/22/200210/22/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/21/2002 at 15:49:06. Contact: ###-####. partial ri ok, r.d. a-11, mech room f.s.s 3rd floor e.9, added f.s. and sink 1st floore.6-10 gw ok. 10/22/2002 11:44:44 AM
PLM01-03016 Plumbing Rough-in10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
A-1 DID NOT DO TRIM\\###-#### this is a ri only final ok, left card at house to get a permit and call for inspection if fixtures have been set. 10/22/2002 11:48:09 AM
PLM02-02641 Water and/or Sewer10/22/200210/22/200210/22/2002 12:00:00 AMAPART
another conference, s.s. expose upper end to lamp, replace lower section due to alighnment and backgrade
PLM02-03226 Plumbing Rough-in10/22/200210/22/200210/22/2002 12:00:00 AMPPASS
###-####
PLM02-01608 Sprinkler (Final)10/22/200210/22/200210/22/2002 12:00:00 AMPPASS
final ok 10/22/2002 2:16:17 PM