Inspections for the day of: Tuesday, October 22, 2002.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00433 Rough-in10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
RUSS, THIS DID NOT HAVE A R/I INSPECTION FOR THE FURNACE ALSO THE PRESSURE TEST FAILED SO BOTH OF THESE NEED TO BE TAKEN CARE OF ...THANKS DARLA ( BECKY WITH Y M C ###-#### )note all that was done to furnace was orf changed from propane to nat gas gas comp sighed off pressure test 10/22/2002 9:18:15 AM
MEC02-03030 Final10/21/200210/22/200210/22/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/21/2002 at 19:01:34. Contact: ###-####.harth is only 12'' in front of stove calls for 16'' 10/22/2002 10:32:28 AM
BLD02-02209 BLD-Footing10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 12:55:29. Contact: ###-####.
BLD02-02046 BLD-Footing10/21/200210/22/200210/22/2002 12:00:00 AMACANC
###-#### steve
MEC01-02038 Final10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
fn insp home -###-#### -hal- work ###-####-received postcard
MEC01-03630 Final10/22/200210/22/200210/22/2002 12:00:00 AMAPASS
BLD00-03667 BLD-Framing/Rough-in10/21/200210/22/200210/22/2002 12:00:00 AMAPASS
###-####ok to cover 10/22/2002 12:09:01 PM
MEC02-00247 Final10/21/200210/22/200210/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 11:40:30. Contact: ###-####.
BLD00-01285 BLD-Final10/21/200210/22/200210/22/2002 12:00:00 AMPDONE
###-#### FRANK PLEASE CALL FOR ACCESS needs temp glass in bathroom 10/22/2002 4:19:23 PM
BLD02-02415 BLD-Footing10/22/200210/22/200210/22/2002 12:00:00 AMPFAIL
jerry; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung hole dug but no one on site 10/22/2002 2:29:28 PM
BLD02-01931 BLD-Foundation10/22/200210/22/200210/22/2002 12:00:00 AMPPART
BLD02-01929 BLD-Foundation10/22/200210/22/200210/22/2002 12:00:00 AMPPASS
MEC01-03224 Final10/21/200210/22/200210/22/2002 12:00:00 AMPPASS
after 3 ###-####
MEC02-02980 Final10/21/200210/22/200210/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 16:34:27. Contact: ###-####.
MEC02-02980 Final10/21/200210/22/200210/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 16:34:27. Contact: ###-####. p/t also passed 10/22/2002 3:30:33 PM
BLD02-01995 BLD-Conference10/22/200210/22/200210/22/2002 12:00:00 AMPDONE
WAYNE CONF FOR SHEAR PANEL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-02046 BLD-Framing/Rough-in10/22/200210/22/200210/22/2002 12:00:00 AMPPART
shear ok to cover ext 10/22/2002 1:09:38 PM
MEC02-02323 Pressure Test10/22/200210/22/200210/22/2002 12:00:00 AMPPASS
stacy- ###-####
BLD02-01923 BLD-Footing10/22/200210/22/200210/22/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/22/2002 at 09:43:41. Contact: .
BLD02-02359 BLD-Footing10/22/200210/22/200210/22/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/22/2002 at 09:57:23. Contact: ###-####.work in progress setbacks ok 95% complete 10/22/2002 2:28:35 PM
BLD02-01931 BLD-Framing/Rough-in10/22/200210/22/200210/22/2002 12:00:00 AMPCANC
###-#### dave
BLD02-01929 BLD-Framing/Rough-in10/22/200210/22/200210/22/2002 12:00:00 AMPCANC
###-####