Inspections for the day of: Wednesday, October 22, 2003.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01742 BLD-Framing/Rough-in10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
JIM; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-02586 BLD-Footing10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
###-#### bob
BLD03-01959 BLD-Energy code compliance10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD03-01813 BLD-Framing/Rough-in10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
sandy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-01813 BLD-Energy code compliance10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
sandy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-02031 BLD-Footing10/21/200310/22/200310/22/2003 12:00:00 AMAPART
ft insp les-- ###-#### setbacks appear OK....Not 24" frost....but owner says he will backfill to comply.....Had wrong letter for soil report.....Need at wall insp. Advised owner. 10/22/2003 8:33:22 AM 10/22/2003 8:33:56 AM
MEC03-01873 Final10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
contact VAl Hill at ###-#### if access code is needed; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
BLD03-00567 BLD-Final10/21/200310/22/200310/22/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/21/2003 at 3:44:31 PM. Contact: ###-####. C/C issued. 10/22/2003 9:30:08 AM
MEC03-02971 Final10/21/200310/22/200310/22/2003 12:00:00 AMPPASS
###-#### Anthony P/T....OK 10/22/2003 1:25:17 PM
BLD03-01414 BLD-Framing/Rough-in10/22/200310/22/200310/22/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/22/2003 at 7:22:35 AM. Contact: ###-####. C/N 10/22/2003 3:30:22 PM
BLD03-02381 BLD-Footing10/22/200310/22/200310/22/2003 12:00:00 AMPPART
Gary ; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 2 #4's throughout footing.....setbacks appear OK per 20-5-5-15. but need appr plans Need to be on site for next insp. N Maple gr pass Ustick.....R Ruth L Jackie 10/22/2003 1:40:10 PM 10/22/2003 1:40:39 PM 10/22/2003 1:44:48 PM
BLD03-01837 BLD-Concrete10/22/200310/22/200310/22/2003 12:00:00 AMPPART
joan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Slab......Still need special insp ...unless letter provided from Engineer. 10/22/2003 5:08:15 PM
BLD03-02237 BLD-Final10/22/200310/22/200310/22/2003 12:00:00 AMPFAIL
David; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Called David....Can't get here for 1hr....cannot wait....recall for Thurs AM. 10/22/2003 12:58:58 PM
BLD02-02710 BLD-Framing/Rough-in10/22/200310/22/200310/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/22/2003 at 11:22:47 AM. Contact: ###-####. 10/22/2003 4:53:35 PM OK to cover top floor and selected areas. 10/22/2003 5:09:16 PM
BLD02-01060 BLD-Framing/Rough-in10/22/200310/22/200310/22/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/22/2003 at 11:23:15 AM. Contact: ###-####. OK to cover top floor. 10/22/2003 5:09:36 PM
MEC03-02076 Final10/22/200310/22/200310/22/2003 12:00:00 AMPPASS
BLD03-01514 BLD-Final10/21/200310/22/200310/22/2003 12:00:00 AMPPASS
DALE; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/C issued. 10/22/2003 5:08:31 PM