ESC07-01488
| Site Preparation | 10/22/2008 | 10/22/2008 | 10/22/2008 1:28:33 PM | P | FAIL |
|
|
Verbal to Contractor: RP listed on permit is not day-to-day. Secure RP for project, protect storm drain (not filter fabric but proper bmp) post sign, verify bags of concrete not uncovered in fenced area, waste mangement, etc. Correct by end of the day on 10-23. Will re-inspect 10-24.
|