ESC08-00225
| Tracking Control | 10/20/2008 | 10/22/2008 | 10/22/2008 3:55:04 PM | P | PART |
|
|
Due the work today the sediment on the parking lot nrrds to be cleaned up. Will re-inspect on 10/27/08.
|
ESC07-01246
| Site Final | 10/22/2008 | 10/22/2008 | 10/22/2008 3:10:54 PM | P | FAIL |
|
|
Need to remove all temporary BMP's. Also still doing interior work on project. Told them to call in for the final once all work is complete.
|
ESC08-00903
| Site Preparation | 10/22/2008 | 10/22/2008 | 10/22/2008 2:57:40 PM | | NR |
|
|
Work will not begin until 10/24/08. Will re-inspect at that time.
|
ESC08-00461
| General Inspection ESC | 10/22/2008 | 10/22/2008 | 10/22/2008 2:30:12 PM | | DONE |
|
|
No activity on site. Site is compliant.
|
ESC07-00904
| General Inspection | 10/22/2008 | 10/22/2008 | 10/22/2008 2:29:14 PM | P | FAIL |
|
|
Correction Notice: 1. Install a proper stabilized construction entrance. Also verbally told RP to maintain trash debris on site. Will re-inspect on 10/24/08 PM
|
ESC08-00884
| Site Preparation | 10/22/2008 | 10/22/2008 | 10/22/2008 1:22:11 PM | | PASS |
|
|
|
ESC08-00294
| General Inspection | 10/16/2008 | 10/22/2008 | 10/22/2008 8:32:33 AM | A | PASS |
|
|
|
ESC08-00716
| Site Final | 10/22/2008 | 10/22/2008 | 10/22/2008 8:23:46 AM | A | FAIL |
|
|
Lot has not been stabilized with either a sprayed tachifier seed mix or a BFM or 2" wash rock over the entire lot. Left a message with the RP the proceedure to reach final stabilzation.
|
ESC08-00864
| Site Preparation | 10/22/2008 | 10/22/2008 | 10/22/2008 7:56:25 AM | | NR |
|
|
No work has begun.
|