ESC07-01219
| Aging Inspection | 10/22/2009 | 10/22/2009 | 10/26/2009 9:26:09 AM | | DONE |
|
|
project done, ok to final
|
ESC09-00086
| General Inspection | 10/22/2009 | 10/22/2009 | 10/22/2009 3:27:24 PM | P | PASS |
|
|
looked ok
|
ESC09-00181
| General Inspection | 10/22/2009 | 10/22/2009 | 10/22/2009 3:26:20 PM | P | PASS |
|
|
looked ok
|
ELE09-01808
| Final | 10/22/2009 | 10/22/2009 | 10/22/2009 3:24:13 PM | P | PART |
|
|
chris Phone #: ###-#### called contractor to clean up entry ceiling, add seismic wires to fixtures,strap mc cable, tie up lv wiring off grid and tiles, main hallway ok to final, will call for am inspection, card to sign is in main hall on wall, no esc this project
|
ELE09-02052
| Electrical Rough-In | 10/21/2009 | 10/22/2009 | 10/22/2009 2:38:10 PM | P | PART |
|
|
bruce - underground cover Phone #: ###-#### ok to cover u/g anop, no esc this project
|
ELE09-02061
| Final | 10/22/2009 | 10/22/2009 | 10/22/2009 1:35:07 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Hardisty gave survey to electrician, NEC 400.5, shall not use so cord for fixed wiring of structure, ok to final, signed structural card, no esc this project
|
ELE09-01826
| Electrical Rough-In | 10/21/2009 | 10/22/2009 | 10/22/2009 10:40:16 AM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Randy Vail ok to cover u/g anop, told to provide service at each building along with electrodes
|
ELE09-02025
| Electrical Rough-In | 10/20/2009 | 10/22/2009 | 10/22/2009 9:58:23 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: TRAVIS WARFIELD called contractor, walls only ok to cover, told to add ground screws, strap mc, provide showroom receptacles and to call for ceiling inspection, no esc this project
|
ELE09-01074
| Electrical Rough-In | 10/21/2009 | 10/22/2009 | 10/22/2009 8:58:03 AM | A | PASS |
|
|
Please provide soffit electrical cover inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean soffits only for outside perimeter ok to cover, told contractor to get set of prints to mark and do partial ri for sections of interiors, and if any cover before inspection, will have to take down what hides electrical, left sticker on front window
|
ELE09-02054
| Conference | 10/21/2009 | 10/22/2009 | 10/22/2009 8:24:42 AM | A | DONE |
|
|
Mike Phone #: ###-#### talked about counter-top space since not island or peninsula with attached wall at end, told electrician can use tombstone or flip-up type receptacles, no esc this project
|