Inspections for the day of: Thursday, October 22, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00446 FIR-Aging Inspection10/22/200910/22/200910/22/2009 5:01:34 PM DONE
Work in progress, construction underway.
FIR09-00286 INSP-Sprinkler Rough-in10/22/200910/22/200910/22/2009 4:58:40 PMPDONE
follow up rough to cover.I would like to meet to discuss what needs to happen in order to final attached units on seperate permits.Scott Carter II ###-#### Phone #: ###-#### Internet Inspection Request from: Scott Carter II
BLD09-01127 FIRE-Final Inspection10/22/200910/22/200910/22/2009 4:57:49 PMPFAIL
See fire code review notes for details, noted missing max. occupant load sign, need to install two exit signs per approved drawings, provide two class K and one 2A10BC fire extinguishers and post as discussed, tenant addresses must match permit documents, tags at the hood suppression systems are missing, etc., discussed issues with the owner/operators on site.
FIR09-00519 INSP-Final Inspection10/22/200910/22/200910/22/2009 4:53:34 PMPPASS
Fire sprinkler permit final approved.
FIR09-00577 INSP-Final Inspection10/22/200910/22/200910/22/2009 4:52:54 PMPPASS
Fire sprinkler permit okayed for final, contractor to replace one escutcheon today as discussed.
BLD09-01188 FIRE-Final Inspection10/22/200910/22/200910/22/2009 4:51:53 PMPPASS
Vanilla life safety passed, advised contractor to apply for a certificate of occupancy request prior to tenant move in.
FIR09-00592 INSP-Sprinkler Rough-in10/22/200910/22/200910/22/2009 4:47:15 PMPPART
Fire sprinkler work per permit documents is okay for cover at apt.# 34 building 1632.
FIR09-00479 INSP-Sprinkler Rough-in/Hydro10/22/200910/22/200910/22/2009 4:45:51 PMAPART
Overhead fire sprinkler rough-in inspection passed with the exception of two locations marked on plans in need of hangers/branchline restraint, cover is not approved until tenting/insulation is completed and inspected for cold cavity protection, be aware of light fixure obstructions that may develop depending on equipment installed, minor field mods. in pipe runs okayed due to 20% cushion in calcs, riser is not yet built.
BLD09-01837 FIRE-Final Inspection10/21/200910/22/200910/22/2009 9:46:14 AMAPASS
Items on correction notice verified for completion, life safety finaled.