Inspections for the day of: Friday, October 22, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00491 INSP-Final Inspection10/22/201010/22/201010/22/2010 3:17:02 PMPPASS
permit finaled
FIR10-00502 INSP-Sprinkler Rough-in10/22/201010/22/201010/22/2010 3:15:22 PMPPASS
The under ground hydrostatic test passed.
FIR10-00473 INSP-Sprinkler Rough-in/Hydro10/22/201010/22/201010/22/2010 2:11:49 PMPPASS
The underground hydro test passed.
FIR10-00511 INSP-Final Inspection10/22/201010/22/201010/22/2010 2:11:16 PMPPASS
Permit finaled
BLD10-02298 FIRE-Final Inspection10/21/201010/22/201010/22/2010 1:08:07 PMAPASS
Life safety passed.
BLD09-00857 FIRE-Final Inspection10/21/201010/22/201010/22/2010 9:20:51 AMACANC
No life safety inspection was performed due to two project related FIR permits not being called in, one of which is still in the REV status due to a resubmittal. I also noted that the address posted on the building is not the address listed on the city approved plans. I spoke to Ryan about these issues and what to due for next week.
FIR10-00054 INSP-Final Inspection10/21/201010/22/201010/22/2010 9:18:01 AMACANC
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.
FIR10-00054 INSP-Alarm Testing10/21/201010/22/201010/22/2010 9:17:40 AMACANC
Jeff and I spoke and agreed the inspection would be canceled due to the project related fire alarm drawings not being issued yet. Without approved drawings the interconnections will not be tested. Inspection to be rescheduled.