Inspections for the day of: Monday, October 22, 2012.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00448 INSP-Final Inspection10/22/201210/22/201210/30/2012 9:40:56 AMPPART
Verified plan modifications, completed final walkthrough. Pending heads at fiberglass FE duct.
FIR11-00645 INSP-Final Inspection10/22/201210/22/201210/30/2012 9:24:28 AMPPEND
Provide as-built plans for changes to system 11 including added heads below ductwork, added branchline, additional uprights in both stairways.
FIR11-00431 INSP-Final Inspection10/22/201210/22/201210/30/2012 9:11:15 AMPPART
Provide as-built drawings to match field installation including added heads for obstructions and modifications to pipe routing.
FIR11-00365 INSP-Final Inspection10/22/201210/22/201210/30/2012 8:55:22 AMPPART
Verify conditions per IFC 1803.10.4.
FIR11-00301 INSP-Final Inspection10/22/201210/22/201210/30/2012 8:44:18 AMPPEND
Ref. activity notes.
FIR11-00664 FIR-Aging Inspection10/22/201210/22/201210/30/2012 8:24:59 AM DONE
In progress
BLD12-01193 FIRE-Final Inspection10/22/201210/22/201210/30/2012 8:20:08 AMPPART
Refer to project related fire alarm and sprinkler permit activity notes for work completed to date. Approval for stock granted per agreement with contractor and discussion with Cheif R. Gervais.
FIR12-00094 INSP-Final Inspection10/19/201210/22/201210/30/2012 8:11:19 AMAPART
Scope of shell fire protection work completed.
FIR12-00451 INSP-Final Inspection10/19/201210/22/201210/30/2012 8:08:28 AMAPART
Completed final system walkthrough. Verified sprinkler monitoring, forward flow test finished. Items noted include; missing escutcheons, travel caps, head cages at uprights below 7', need to install intermediate temp heads at the skylights (8 locations), caps at end mains to remain accessible. Note- some items finished while on site.
FIR12-00523 INSP-Alarm Testing10/22/201210/22/201210/30/2012 7:56:16 AMAPART
Field verified previous corrections and adjustments. Completed testing at the FACP, sprinkler monitoring, MP, SD, notification circuts, duct detectors, verified monitoring. Items incomplete or not ready for testing include elevator control functions and hood suppression system monitoring.
FIR11-00524 INSP-Final Inspection10/22/201210/22/201210/30/2012 7:42:46 AMPPART
Plan modifications and field install checked for equivalence.
FIR12-00102 INSP-Final Inspection10/22/201210/22/201210/30/2012 7:24:43 AMPPART
Corrections finished, completed final walkthrough for the scope of permit work.
FIR12-00189 INSP-Final Inspection10/22/201210/22/201210/30/2012 7:11:51 AMPPART
Upright sprinklers provided under north and south side round ducts, one leak at a swing joint repaired.
FIR12-00572 INSP-Final Inspection10/22/201210/22/201210/22/2012 2:35:18 PMPCANC
Overbooked
FIR12-00314 INSP-Final Inspection10/19/201210/22/201210/22/2012 2:29:44 PMPPASS
Scope of work finished. Fire sprinkler permit finaled.
BLD12-01055 FIRE-Final Inspection10/19/201210/22/201210/22/2012 2:28:58 PMAPASS
Fire life safety inspection completed acceptable.
FIR12-00314 INSP-Final Inspection10/19/201210/22/201210/22/2012 2:27:04 PMAPASS
QOD on the dry system installed, trip testing passed. Fire sprinkler permit final approved.
FIR12-00602 INSP-Final Inspection10/19/201210/22/201210/22/2012 2:25:40 PMAPASS
Corrections finished, fire alarm permit finaled.
BLD12-02480 FIRE-Final Inspection10/22/201210/22/201210/22/2012 2:04:47 PMPCANC
Overbooked
FIR12-00524 INSP-Final Inspection10/17/201210/22/201210/22/2012 1:47:53 PMAPART
Overhead hydrostatic test completed satisfactory. Final pending rough-in adjustments.
FIR12-00524 INSP-Sprinkler Rough-in/Hydro10/17/201210/22/201210/22/2012 1:45:22 PMAFAIL
Correction items include; missing drum drip at the low conveyor east end, plugged weld outlet in the pendent position to be removed or relocated, raise one upright, noted mixed temperature heads are installed at conveyors (155 deg. at the new equipment and 200 deg. at existing conveyors).
BLD12-02755 FIRE-Final Inspection10/19/201210/22/201210/22/2012 11:38:55 AMAPASS
Fire life safety passed. Tenant to remove max. occupant load signs which state the incorrect number at 63- permit documents indicate B 47.