FIR11-00448
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 9:40:56 AM | P | PART |
|
|
Verified plan modifications, completed final walkthrough. Pending heads at fiberglass FE duct.
|
FIR11-00645
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 9:24:28 AM | P | PEND |
|
|
Provide as-built plans for changes to system 11 including added heads below ductwork, added branchline, additional uprights in both stairways.
|
FIR11-00431
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 9:11:15 AM | P | PART |
|
|
Provide as-built drawings to match field installation including added heads for obstructions and modifications to pipe routing.
|
FIR11-00365
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 8:55:22 AM | P | PART |
|
|
Verify conditions per IFC 1803.10.4.
|
FIR11-00301
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 8:44:18 AM | P | PEND |
|
|
Ref. activity notes.
|
FIR11-00664
| FIR-Aging Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 8:24:59 AM | | DONE |
|
|
In progress
|
BLD12-01193
| FIRE-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 8:20:08 AM | P | PART |
|
|
Refer to project related fire alarm and sprinkler permit activity notes for work completed to date. Approval for stock granted per agreement with contractor and discussion with Cheif R. Gervais.
|
FIR12-00094
| INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/30/2012 8:11:19 AM | A | PART |
|
|
Scope of shell fire protection work completed.
|
FIR12-00451
| INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/30/2012 8:08:28 AM | A | PART |
|
|
Completed final system walkthrough. Verified sprinkler monitoring, forward flow test finished. Items noted include; missing escutcheons, travel caps, head cages at uprights below 7', need to install intermediate temp heads at the skylights (8 locations), caps at end mains to remain accessible. Note- some items finished while on site.
|
FIR12-00523
| INSP-Alarm Testing | 10/22/2012 | 10/22/2012 | 10/30/2012 7:56:16 AM | A | PART |
|
|
Field verified previous corrections and adjustments. Completed testing at the FACP, sprinkler monitoring, MP, SD, notification circuts, duct detectors, verified monitoring. Items incomplete or not ready for testing include elevator control functions and hood suppression system monitoring.
|
FIR11-00524
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 7:42:46 AM | P | PART |
|
|
Plan modifications and field install checked for equivalence.
|
FIR12-00102
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 7:24:43 AM | P | PART |
|
|
Corrections finished, completed final walkthrough for the scope of permit work.
|
FIR12-00189
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 7:11:51 AM | P | PART |
|
|
Upright sprinklers provided under north and south side round ducts, one leak at a swing joint repaired.
|
FIR12-00572
| INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/22/2012 2:35:18 PM | P | CANC |
|
|
Overbooked
|
FIR12-00314
| INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 2:29:44 PM | P | PASS |
|
|
Scope of work finished. Fire sprinkler permit finaled.
|
BLD12-01055
| FIRE-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 2:28:58 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR12-00314
| INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 2:27:04 PM | A | PASS |
|
|
QOD on the dry system installed, trip testing passed. Fire sprinkler permit final approved.
|
FIR12-00602
| INSP-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 2:25:40 PM | A | PASS |
|
|
Corrections finished, fire alarm permit finaled.
|
BLD12-02480
| FIRE-Final Inspection | 10/22/2012 | 10/22/2012 | 10/22/2012 2:04:47 PM | P | CANC |
|
|
Overbooked
|
FIR12-00524
| INSP-Final Inspection | 10/17/2012 | 10/22/2012 | 10/22/2012 1:47:53 PM | A | PART |
|
|
Overhead hydrostatic test completed satisfactory. Final pending rough-in adjustments.
|
FIR12-00524
| INSP-Sprinkler Rough-in/Hydro | 10/17/2012 | 10/22/2012 | 10/22/2012 1:45:22 PM | A | FAIL |
|
|
Correction items include; missing drum drip at the low conveyor east end, plugged weld outlet in the pendent position to be removed or relocated, raise one upright, noted mixed temperature heads are installed at conveyors (155 deg. at the new equipment and 200 deg. at existing conveyors).
|
BLD12-02755
| FIRE-Final Inspection | 10/19/2012 | 10/22/2012 | 10/22/2012 11:38:55 AM | A | PASS |
|
|
Fire life safety passed. Tenant to remove max. occupant load signs which state the incorrect number at 63- permit documents indicate B 47.
|