Inspections for the day of: Monday, October 22, 2012.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00569 General Inspection10/22/201210/22/201210/23/2012 1:53:11 PM PASS
ESC11-00681 General Inspection10/22/201210/22/201210/23/2012 9:23:49 AM PART
Waiting on final srtabilization.
ESC12-00912 General Inspection10/22/201210/22/201210/22/2012 4:34:07 PM PART
Verbal to RP:
To prevent erosion off of the property, you must install sediment barriers at a minimum in the front section of the access and try to initiate perminate stabilization measure as soon as practible.
ESC12-00700 General Inspection10/22/201210/22/201210/22/2012 3:03:02 PM PART
Verbal to RP;
Recommend to move the wattle down to te lower section of the slope due to slopes being bare of all soil. Will check up on te next assigned inspection.
ESC11-00326 General Inspection10/22/201210/22/201210/22/2012 2:55:48 PM FAIL
Need to stabilize slopes.
ESC11-00176 Tracking Control10/22/201210/22/201210/22/2012 2:17:56 PMPPASS
ESC12-00741 Site Preparation10/18/201210/22/201210/22/2012 11:23:35 AMAPART
Project just began Friday. Explained to RP that the stormdrain outside of the construction fence must be protected. Will verify on 10/24/2012.
ESC11-00496 Aging Inspection10/22/201210/22/201210/22/2012 9:51:49 AM DONE
Permit finaled.
ESC11-00496 DOC - Permit Finaled10/22/201210/22/201210/22/2012 9:51:38 AMPPASS
ESC11-00456 Aging Inspection10/22/201210/22/201210/22/2012 9:50:36 AM PASS
ESC12-00024 General Inspection10/22/201210/22/201210/22/2012 9:50:11 AM PASS
ESC12-00746 BMP Violation10/19/201210/22/201210/22/2012 9:47:59 AMAFAIL
Issue was addresssed last Friday. Contacted the RP and explained to him the additional sediment has and is deposited in the gutter pan and street from todays activities. Needs to be cleaned up as soon as practible but not later than by the end of the work day or prior to and storm events. Will re-inspect on 10/23/2012 AM for compliance.
ESC11-00525 BMP Violation10/22/201210/22/201210/22/2012 9:22:18 AMAFAIL
Correction Notice Posted:(Contacted RP)
1. Clean up all sediment and debris off of the hards surfaces.
2. Protect all storm drains within the interior of the subdivision.
Failure to comply will result in a stop work order. Will re-inspect on 10/23/2012 PM.
ESC11-00176 Tracking Control10/22/201210/22/201210/22/2012 9:20:02 AMAFAIL
Correction Notice Posted; (contacted Mike Smith RP)
Clean up all sediment and derbis off of the hard surfaces.
Maintain the storm drain inlet prtection within the north section of the project area. Failure to compl with this notice will result in a STOP WORK ORDER.
Will re-inspect on 10/22/2012 PM.
ESC12-00023 General Inspection10/22/201210/22/201210/22/2012 8:15:19 AM FAIL
No controls have been implimented for final stabilization.
ESC11-00378 Aging Inspection10/22/201210/22/201210/22/2012 8:13:28 AM PART
No activities, but no issues