BLD13-00729
| FIRE-Final Inspection | 10/21/2013 | 10/22/2013 | 10/23/2013 5:45:26 AM | P | PART |
|
|
Final pending project related fire sprinkler permit items and finishes.
|
FIR13-00248
| INSP-Final Inspection | 10/21/2013 | 10/22/2013 | 10/23/2013 5:44:25 AM | P | NR |
|
|
Pending items for project related OH FIR13-00348 including forward flow, access to the FDC, outside bell is not functional, need verification of dry system capacity as trip testing time results over 60 sec., DP heads are not yet installed at the outside canopies.
|
FIR13-00474
| INSP-Final Inspection | 10/21/2013 | 10/22/2013 | 10/23/2013 5:37:09 AM | P | PASS |
|
|
Fire alarm permit work completed and passed inspection.
|
BLD13-02304
| FIRE-Conference | 10/22/2013 | 10/22/2013 | 10/22/2013 12:20:30 PM | A | DONE |
|
|
Tenant remodel work will require modifications to the existing fire alarm system to be completed with an issued fire alarm permit as discussed.
|
BLD11-00972
| FIRE-Final Inspection | 10/22/2013 | 10/22/2013 | 10/22/2013 12:18:05 PM | A | PART |
|
|
Door hardware has been revised per vendor, need to provide fire extinguisher as discussed.
|
BLD13-02488
| FIRE-Conference | 10/22/2013 | 10/22/2013 | 10/22/2013 12:16:15 PM | A | DONE |
|
|
Regarding glass windows at new offices and fire sprinkler coverage.
|
FIR13-00264
| INSP-Sprinkler Rough-in | 10/22/2013 | 10/22/2013 | 10/22/2013 12:14:19 PM | A | PART |
|
|
Okay to cover overhead work at the kitchen grid ceilings.
|