Inspections for the day of: Tuesday, October 22, 2013.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00006 Aging Inspection10/22/201310/22/201310/22/2013 4:38:45 PM PASS
Finaled.
ESC13-00006 DOC - Permit Finaled10/22/201310/22/201310/22/2013 4:38:31 PMPPASS
House is complete, stabilized, landscaped, and occupied. No further ESC inspections required, permit conditions satisfied.
ESC13-00617 Site Preparation10/22/201310/22/201310/22/2013 4:33:58 PMPNR
CLINT Phone #: ###-####

No changes to site since prior day. No BMPs set up or permits posted. Site is not ready.
ESC13-00110 Aging Inspection10/22/201310/22/201310/22/2013 4:07:47 PM PASS
Finaled. Permit expired.
ESC13-00343 Site Final10/22/201310/22/201310/22/2013 4:05:25 PMPCANC
Duplicate entry
ESC13-00343 DOC - Permit Finaled10/22/201310/22/201310/22/2013 4:05:01 PMPPASS
Finaled.
ESC13-00110 DOC - Permit Finaled10/22/201310/22/201310/22/2013 1:19:10 PMPPASS
Permit is expired. No activity observed and no violations.
ESC13-00095 Aging Inspection10/22/201310/22/201310/22/2013 1:06:13 PM PASS
No activity at time of inspection. No ESC corrections required. Work is within stabilized area in back yard.
ESC12-00761 Aging Inspection10/22/201310/22/201310/22/2013 12:13:05 PM PASS
Project on going; no corrections necessary at this time
ESC12-00663 General Inspection10/22/201310/22/201310/22/2013 12:04:05 PM PASS
Finaled.
ESC12-00663 DOC - Permit Finaled10/22/201310/22/201310/22/2013 12:03:48 PMPPASS
Project complete and stabilized. Inlet protection remains on one on-site drainage structure (sand/oil trap inside rocky swale with french drain). All other drains for impermaeble surface unobstructed. ESC requirements satisfied. All other permits were already finaled.
ESC12-00746 General Inspection10/22/201310/22/201310/22/2013 11:25:29 AM PASS
Sudvision development. Roads laid and infrastructure. Some lots remain open. BMPS in place; no track out.
ESC13-00364 General Inspection10/22/201310/22/201310/22/2013 11:03:13 AM PASS
BMPs in place, no corrections at time of inspection.
ESC13-00396 General Inspection10/22/201310/22/201310/22/2013 10:43:55 AM PASS
Does not have discharge to MS4. Permit posted. Application received prior to site prep inspection requirement. No violations at time of inspection.
ESC12-01081 Aging Inspection10/22/201310/22/201310/22/2013 10:26:03 AM PASS
Finaled.
ESC12-01081 DOC - Permit Finaled10/22/201310/22/201310/22/2013 10:25:45 AMPPASS
Project complete. ESC requirements completed, no further inspections necessary.
ESC13-00448 General Inspection10/22/201310/22/201310/22/2013 9:54:27 AM PASS
ESC11-00879 General Inspection10/22/201310/22/201310/22/2013 9:48:22 AM PART
Subdivision development BMPs in place, no trackout or other corrections. Individual homesite with ESC13-00824 had cement dust from dry cutting cement. No water hook up at site and no portable source provided. Gave verbal CN to contractors to provide dust suppression.
ESC13-00451 General Inspection10/22/201310/22/201310/22/2013 9:22:32 AM PASS
Finaled.
ESC13-00451 DOC - Permit Finaled10/22/201310/22/201310/22/2013 9:22:13 AMPPASS
Project complete and stabilized. ESC requirements satisfied; BLD has been finaled.
ESC13-00380 General Inspection10/22/201310/22/201310/22/2013 9:07:30 AM PASS
Permit posted. No ESC corrections necessary. WIP
ESC13-00407 General Inspection10/22/201310/22/201310/22/2013 8:47:53 AM PASS
Finaled.
ESC13-00407 DOC - Permit Finaled10/22/201310/22/201310/22/2013 8:47:33 AMPPASS
Driveway has been poured. Remodel complete. No activity or permits open. ESC requirements have been met.