FIR14-00397
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/22/2014 | 10/22/2014 3:42:44 PM | P | CANC |
|
|
Rough in good. Tenting needs to be re-inspected, not secured on pipe.
|
FIR14-00419
| INSP-Supply line flush | 10/22/2014 | 10/22/2014 | 10/22/2014 3:41:22 PM | P | PASS |
|
|
Flush good. Concrete around riser needs to be broken up and looked at on another inspection.
|
FIR14-00418
| INSP-Supply line flush | 10/22/2014 | 10/22/2014 | 10/22/2014 3:41:00 PM | P | PASS |
|
|
Flush good. Concrete around riser needs to be broken up and looked at on another inspection.
|
FIR14-00417
| INSP-Supply line flush | 10/22/2014 | 10/22/2014 | 10/22/2014 3:40:35 PM | P | PASS |
|
|
Flush good. Concrete around riser needs to be broken up and looked at on another inspection.
|
FIR14-00573
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/22/2014 | 10/22/2014 3:25:26 PM | P | PART |
|
|
This was to inspect the rough underground from street to future building so that line can be covered. No hydro done. Depth of cover is good.
|
BLD14-01236
| FIRE-Final Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 3:23:12 PM | P | PASS |
|
|
Fire and life safety inspection pass
|
FIR14-00444
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/22/2014 3:22:19 PM | P | PASS |
|
|
System tested and pass
|
FIR14-00433
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/22/2014 3:21:38 PM | P | PASS |
|
|
System tested and pass
|
FIR14-00556
| INSP-Sprinkler Rough-in/Hydro | 10/21/2014 | 10/22/2014 | 10/22/2014 3:18:17 PM | P | PASS |
|
|
AG hydro and rough in pass.
|
FIR14-00554
| INSP-Sprinkler Rough-in/Hydro | 10/21/2014 | 10/22/2014 | 10/22/2014 3:15:42 PM | P | CANC |
|
|
AG Hydro and rough in pass.
|