FIR14-00354
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 3:46:20 PM | P | DEFR |
|
|
|
FIR14-00710
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 3:45:44 PM | P | DEFR |
|
|
|
FIR14-00707
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 3:44:18 PM | P | DEFR |
|
|
|
BLD14-00457
| FIRE-Final Inspection | 10/21/2014 | 10/22/2014 | 10/23/2014 2:46:57 PM | A | DEFR |
|
|
Pending project related FIR permit finals.
|
FIR14-00721
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/22/2014 | 10/22/2014 4:33:51 PM | P | PART |
|
|
Okay to cover IBR and stub to the 1st 90 at the west building as marked and dated on approved plan set.
|
FIR14-00636
| INSP-Final Inspection | 10/22/2014 | 10/22/2014 | 10/22/2014 4:18:32 PM | P | PASS |
|
|
Scope of fire sprinkler work passed both rough-in and final inspections.
|
FIR14-00588
| INSP-Final Inspection | 10/16/2014 | 10/22/2014 | 10/22/2014 3:33:17 PM | A | PART |
|
|
Completed satisfactory inspection and testing of new fire alarm work. Final pending installation of a waterflow bell for the wet system.
|
FIR14-00486
| INSP-Final Inspection | 10/16/2014 | 10/22/2014 | 10/22/2014 2:27:19 PM | P | FAIL |
|
|
C/N items include; provide tamper switch at the PIV, repair outside waterflow bell, provide knox box, relocate SD used for door release service at the 2nd floor level, basement level lobby SD did not initiate elevator recall, fire hat flash is not functional. Refer to plan review notes items #3,8,12,13,23 for details.
|
FIR14-00604
| INSP-Sprinkler Rough-in/Hydro | 10/21/2014 | 10/22/2014 | 10/22/2014 1:25:34 PM | A | DEFR |
|
|
Bldg B 2nd Floor Please call Roy 30 mins prior Phone #: ###-#### Inspection requested via web by Jacci Hunt
|
BLD14-02532
| FIRE-Final Inspection | 10/21/2014 | 10/22/2014 | 10/22/2014 11:27:31 AM | A | PASS |
|
|
Life safety passed provided the max. occupant load sign is posted per plan review red-line. Second exit is provided out the west side of the open dining area-
|
FIR14-00527
| INSP-Sprinkler Rough-in | 10/21/2014 | 10/22/2014 | 10/22/2014 10:59:54 AM | A | PART |
|
|
Okay to cover fire sprinkler work at the grid ceilings per dated annotations on plans including remainder of TI space.
|
FIR14-00748
| INSP-Sprinkler Rough-in | 10/21/2014 | 10/22/2014 | 10/22/2014 10:37:13 AM | A | PART |
|
|
Overhead fire sprinkler modifications at the mens and womens restroom remodel as marked and dated on approved plans okay for ceiling cover.
|
FIR14-00521
| INSP-Final Inspection | 10/21/2014 | 10/22/2014 | 10/22/2014 9:33:28 AM | A | PASS |
|
|
UG fire supply line flush completed satisfactory. UG permit work finished, okay for final.
|