Inspections for the day of: Thursday, October 22, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00590 Aging Inspection10/22/201510/22/201510/22/2015 4:10:07 PM PASS
Parks n rec annual permit , no formal inspection. No issues with P& R crews' work. Parks projects with subcontractors have seperate ESC permits.
ESC15-00083 General Inspection10/22/201510/22/201510/22/2015 4:08:26 PM PASS
ESC15-00094 Conference10/21/201510/22/201510/22/2015 3:11:12 PMACANC
rescheduled with RP.
ESC15-00591 Aging Inspection10/22/201510/22/201510/22/2015 3:10:37 PM PASS
ESC14-01106 General Inspection10/22/201510/22/201510/22/2015 2:05:36 PM PASS
Work near completion. Staging area fencing has been disassmbled. No trackout or discahrges from site. Disturbed area will be seeded, currently contained with perimeter wattle. Approved.
ESC15-00103 General Inspection10/22/201510/22/201510/22/2015 1:39:50 PM PASS
No new activity in home relocation and site preparation for future Fowler building. No sediment leaving site, no trash or material issues.
ESC15-01093 Site Preparation10/21/201510/22/201510/22/2015 1:39:43 PMAPASS
Brett Phone #: ###-####

Approved for excavation. No corrections at this time for CBH in Peppermill
ESC15-00513 Aging Inspection10/22/201510/22/201510/22/2015 12:04:43 PM PASS
Pool construction complete. No issues at site.
ESC15-00513 DOC - Permit Finaled10/22/201510/22/201510/22/2015 12:04:19 PMPPASS
ESC14-00179 Site Final10/22/201510/22/201510/22/2015 10:57:04 AMPPASS
Construction now complete, yard is stabilized and landscaped. Streets and sidewalks are clean. All permits finaled.
ESC15-01300 Site Preparation10/21/201510/22/201510/22/2015 10:48:49 AMAPASS
Keath Phone #: ###-####

RP onsite, site drainage already constructed and retains stormwater and sheetflow onsite. Washout pit has been built and will lined. Construction entrance and parking area has had road mix and sand compacted to prevent mud. Working well for initial offhauling of excavated dirt. Approved. RP-GC lives next door.
ESC15-01317 Site Preparation10/21/201510/22/201510/22/2015 10:48:20 AMAPASS
Keath Phone #: ###-####

RP onsite, site drainage already constructed and retains stormwater and sheetflow onsite. Washout pit has been built and will lined. Construction entrance and parking area has had road mix and sand compacted to prevent mud. Working well for initial offhauling of excavated dirt. Approved. RP-GC lives next door.
ESC12-00842 General Inspection10/22/201510/22/201510/22/2015 10:20:08 AMPPASS
WIP on SFHs by Jayo Co. in Trailwind Sub. Permit signs posted, streets and gutters are free of loose sediment or trackout. Perimeter wattles installed on vacant lots with potential for sediment runoff. Trash contained. Subdivision is approximately 75% complete. No corrections.
ESC15-00501 DOC - Permit Finaled10/22/201510/22/201510/22/2015 10:16:48 AMPPASS
Home complete, front yard landscaped and is now occupied. Adjacent home in progress, so temp BMPs can remain. Trailwind Sub in good condition currenly.
ESC15-00065 General Inspection10/22/201510/22/201510/22/2015 9:31:29 AM PASS
ESC14-01151 General Inspection10/22/201510/22/201510/22/2015 8:56:10 AM PASS
Home complete, BLD finaled. Final landscaping and revegetation on hillside in progress.