ESC15-00590
| Aging Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 4:10:07 PM | | PASS |
|
|
Parks n rec annual permit , no formal inspection. No issues with P& R crews' work. Parks projects with subcontractors have seperate ESC permits.
|
ESC15-00083
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 4:08:26 PM | | PASS |
|
|
|
ESC15-00094
| Conference | 10/21/2015 | 10/22/2015 | 10/22/2015 3:11:12 PM | A | CANC |
|
|
rescheduled with RP.
|
ESC15-00591
| Aging Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 3:10:37 PM | | PASS |
|
|
|
ESC14-01106
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 2:05:36 PM | | PASS |
|
|
Work near completion. Staging area fencing has been disassmbled. No trackout or discahrges from site. Disturbed area will be seeded, currently contained with perimeter wattle. Approved.
|
ESC15-00103
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 1:39:50 PM | | PASS |
|
|
No new activity in home relocation and site preparation for future Fowler building. No sediment leaving site, no trash or material issues.
|
ESC15-01093
| Site Preparation | 10/21/2015 | 10/22/2015 | 10/22/2015 1:39:43 PM | A | PASS |
|
|
Brett Phone #: ###-####
Approved for excavation. No corrections at this time for CBH in Peppermill
|
ESC15-00513
| Aging Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 12:04:43 PM | | PASS |
|
|
Pool construction complete. No issues at site.
|
ESC15-00513
| DOC - Permit Finaled | 10/22/2015 | 10/22/2015 | 10/22/2015 12:04:19 PM | P | PASS |
|
|
|
ESC14-00179
| Site Final | 10/22/2015 | 10/22/2015 | 10/22/2015 10:57:04 AM | P | PASS |
|
|
Construction now complete, yard is stabilized and landscaped. Streets and sidewalks are clean. All permits finaled.
|
ESC15-01300
| Site Preparation | 10/21/2015 | 10/22/2015 | 10/22/2015 10:48:49 AM | A | PASS |
|
|
Keath Phone #: ###-####
RP onsite, site drainage already constructed and retains stormwater and sheetflow onsite. Washout pit has been built and will lined. Construction entrance and parking area has had road mix and sand compacted to prevent mud. Working well for initial offhauling of excavated dirt. Approved. RP-GC lives next door.
|
ESC15-01317
| Site Preparation | 10/21/2015 | 10/22/2015 | 10/22/2015 10:48:20 AM | A | PASS |
|
|
Keath Phone #: ###-####
RP onsite, site drainage already constructed and retains stormwater and sheetflow onsite. Washout pit has been built and will lined. Construction entrance and parking area has had road mix and sand compacted to prevent mud. Working well for initial offhauling of excavated dirt. Approved. RP-GC lives next door.
|
ESC12-00842
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 10:20:08 AM | P | PASS |
|
|
WIP on SFHs by Jayo Co. in Trailwind Sub. Permit signs posted, streets and gutters are free of loose sediment or trackout. Perimeter wattles installed on vacant lots with potential for sediment runoff. Trash contained. Subdivision is approximately 75% complete. No corrections.
|
ESC15-00501
| DOC - Permit Finaled | 10/22/2015 | 10/22/2015 | 10/22/2015 10:16:48 AM | P | PASS |
|
|
Home complete, front yard landscaped and is now occupied. Adjacent home in progress, so temp BMPs can remain. Trailwind Sub in good condition currenly.
|
ESC15-00065
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 9:31:29 AM | | PASS |
|
|
|
ESC14-01151
| General Inspection | 10/22/2015 | 10/22/2015 | 10/22/2015 8:56:10 AM | | PASS |
|
|
Home complete, BLD finaled. Final landscaping and revegetation on hillside in progress.
|