MEC18-03016
| Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 3:58:27 PM | P | FAIL |
|
|
Mike Phone #: ###-####- Duct work and furnace ok- line set in wall has rips in the insulation that need repaired- lineset needs supported in ceiling space- condensate needs supported in ceiling space - need to see dryer vent finished looks to still be inside the wall - need to also add duct work and dryer vent to permit
|
MEC18-05071
| Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 3:02:28 PM | P | NH |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Stegemann- no access
|
MEC18-03094
| Final | 10/22/2018 | 10/22/2018 | 10/22/2018 3:00:51 PM | P | PART |
|
|
FINAL - CALL RANDY Phone #: ###-#### Inspection requested via web by Brandon Sorensen- refrigeration lines ok - still need to see charging station for lifts finished- still need to see rough in on a mini split at front of building GC is working on getting started- TEMP OCC ok- no card to sign onsite
|
MEC18-05057
| Final | 10/19/2018 | 10/22/2018 | 10/22/2018 2:12:21 PM | P | PASS |
|
|
Please inspect in the late PM and call on way: Chuck ###-#### Phone #: ###-#### Inspection requested via web by Carol Clark
|
MEC18-05057
| Pressure Test | 10/19/2018 | 10/22/2018 | 10/22/2018 2:12:12 PM | P | PASS |
|
|
Please inspect in the late PM and call on way: Chuck ###-#### Phone #: ###-#### Inspection requested via web by Carol Clark - 60lb gas pressure test ok-
|
MEC17-02565
| Mec-Aging Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 1:33:49 PM | | CANC |
|
|
|
MEC18-05025
| Final | 10/18/2018 | 10/22/2018 | 10/22/2018 1:32:45 PM | P | PASS |
|
|
installer Travis ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt - furnace only co ok
|
MEC18-02743
| Conference | 10/22/2018 | 10/22/2018 | 10/22/2018 1:32:21 PM | P | FAIL |
|
|
Inspection on HVAC needs to be called in for a R/I
|
MEC18-02761
| Conference | 10/22/2018 | 10/22/2018 | 10/22/2018 1:29:50 PM | P | DONE |
|
|
need to see range hood vent installed- venting was covered up before R/I inspection was done
|
MEC18-03664
| Final | 10/19/2018 | 10/22/2018 | 10/22/2018 10:44:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- balance report for pizza oven ok- final ok- card signed
|
MEC18-04204
| Final | 10/19/2018 | 10/22/2018 | 10/22/2018 10:37:48 AM | A | PASS |
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- gas piping final ok
|
MEC18-04527
| Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 10:37:27 AM | A | PASS |
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- R/I ok
|
MEC18-04527
| Pressure Test | 10/19/2018 | 10/22/2018 | 10/22/2018 10:37:09 AM | A | PASS |
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER- 60lb gas pressure test ok-
|
MEC18-04948
| Final | 10/17/2018 | 10/22/2018 | 10/22/2018 9:57:04 AM | A | PASS |
|
|
PLEASE CALL OUR INSTALLER SAM WHEN 30-45 MINS IN ROUTE SO WE CAN GO PRESSURE UP FLUE BY TIME YOU ARRIVE. Phone #: ###-#### Inspection requested via web by Rick Montgomery - 5lb flue ok- furnace ac coil co ok
|
MEC18-04508
| Final | 10/19/2018 | 10/22/2018 | 10/22/2018 9:11:35 AM | A | PASS |
|
|
Please call Dave at ###-#### or Dan at ###-#### with a 30 minute heads up arrival time. Thank you! Phone #: ###-#### Inspection requested via web by David or K Cole- final ok
|
MEC18-04889
| Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 9:01:50 AM | A | PASS |
|
|
Joe Phone #: ###-####- R/I ok- equipment has been checked
|
MEC18-04886
| Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 9:01:23 AM | A | PASS |
|
|
Joe Phone #: ###-####- R/I ok- equipment has been checked
|
MEC18-04352
| Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 8:40:22 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Carol Clark- still need to see city approved Man J onsite that is stamped
|
MEC17-03644
| Mec-Aging Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 8:01:11 AM | | FAIL |
|
|
no inspection scheduled
|
MEC18-05042
| Pressure Test | 10/19/2018 | 10/22/2018 | 10/22/2018 7:49:20 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Frank Marturello Inspection cancelled from web by: Frank Marturello
|
MEC18-05042
| Rough-in | 10/19/2018 | 10/22/2018 | 10/22/2018 7:49:16 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Frank Marturello Inspection cancelled from web by: Frank Marturello
|