ELE19-03893
| Electrical Rough-In | 10/22/2019 | 10/22/2019 | 10/23/2019 4:32:36 PM | P | PASS |
|
|
Lock box code 2859. If you have any questions please feel free to contact Andrew ###-#### or Fred ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover walls and hardlid celing in office
|
ELE19-03870
| Permanent Service | 10/22/2019 | 10/22/2019 | 10/22/2019 2:05:11 PM | P | PASS |
|
|
###-#### p/s o/h n ok
|
ELE19-04059
| Conference | 10/21/2019 | 10/22/2019 | 10/22/2019 1:27:58 PM | A | DONE |
|
|
Call for access- Jay Phone #: ###-#### Contact number is incorrect, number is ###-####. Discussed new service on shop to re-feed house. Grounding, mast height, wire size.
|
ELE19-03285
| Final | 10/22/2019 | 10/22/2019 | 10/22/2019 12:54:21 PM | P | PASS |
|
|
final laundry room addition Erin ###-#### Phone #: ###-#### Inspection requested via web by Dale Johnson Ok final.
|
ELE19-04042
| Final | 10/22/2019 | 10/22/2019 | 10/22/2019 12:53:45 PM | P | PASS |
|
|
mitch Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
|
ELE19-03870
| Final | 10/21/2019 | 10/22/2019 | 10/22/2019 11:18:07 AM | P | CANC |
|
|
Main Service Panel Upgrade final needed to turn power back on. Phone #: ###-#### Inspection requested via web by Seth Stears Changed to p/s not final
|
ELE19-02699
| Final | 10/22/2019 | 10/22/2019 | 10/22/2019 10:50:57 AM | A | PASS |
|
|
Pool vault is ready for inspection. Call before and I will meet you there, I will need to meet you there to open gates and get you inside. 10:00 am would be a good time but I am flexible for what works, call me let me know. Phone #: ###-#### Inspection requested via web by Kurt Carlson
|
ELE19-03199
| Final | 10/21/2019 | 10/22/2019 | 10/22/2019 10:50:05 AM | A | CANC |
|
|
Ready for re-inspection / corrections/ final -Please call ###-#### when your are on your way - ( give 20 min please) if possible Phone #: ###-#### Inspection requested via web by Kendra Lanham Rescheduled to 10/23
|
ELE19-03811
| Permanent Service | 10/21/2019 | 10/22/2019 | 10/22/2019 9:50:56 AM | A | PASS |
|
|
House was relocated. Old overhead service had no labels, will not be able to label new panel until after service is energized. Thank you. Phone #: ###-#### Inspection requested via web by shane miller p/s u/g n ok
|
ELE19-04051
| Electrical Rough-In | 10/21/2019 | 10/22/2019 | 10/22/2019 9:34:27 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender Ok cover down bath and laundry.. All existing elec equipt not being used to be removed.
|
ELE17-01699
| ELE-Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 5:55:04 AM | | DONE |
|
|
3rd attempt. Schedule a final inspection.
|
ELE17-02596
| ELE-Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 5:54:15 AM | | FAIL |
|
|
Schedule a final inspection.
|
ELE19-04049
| Permanent Service | 10/21/2019 | 10/22/2019 | 10/21/2019 11:02:01 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Garrett Collins Inspection cancelled from web by: Garrett Collins
|