Inspections for the day of: Tuesday, October 23, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02001 BLD-Aging Inspection10/23/200110/23/200110/23/2001 12:00:00 AM DONE
BLD01-01986 BLD-Aging Inspection10/23/200110/23/200110/23/2001 12:00:00 AM DONE
BLD01-02431 BLD-Framing/Rough-in10/22/200110/23/200110/23/2001 12:00:00 AMAPASS
###-#### DREW
BLD01-02514 BLD-Footing10/22/200110/23/200110/23/2001 12:00:00 AMAPASS
###-#### ED north end 10/23/2001 9:27:55 AM
BLD01-02555 BLD-Framing/Rough-in10/22/200110/23/200110/23/2001 12:00:00 AMAFAIL
###-#### DAVID needs elec and plumbing also needs fire stopping in floor 10/23/2001 11:58:14 AM
BLD01-02292 BLD-Framing/Rough-in10/22/200110/23/200110/23/2001 12:00:00 AMAPASS
SHEER WALL ###-#### DAVID nailing on sheet rock in dressing room 10/23/2001 10:57:14 AM
BLD01-01994 BLD-Footing10/22/200110/23/200110/23/2001 12:00:00 AMAPASS
###-#### mti inspecting rebar and concrete 10/23/2001 9:52:00 AM
BLD01-02431 BLD-Energy code compliance10/23/200110/23/200110/23/2001 12:00:00 AMAPASS
Added by Inspector: 425 On 10/23/2001 9:31:21 AM
BLD01-02125 BLD-Final10/22/200110/23/200110/23/2001 12:00:00 AMPPASS
###-#### WALT
BLD01-01275 BLD-Final10/22/200110/23/200110/23/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/22/2001 at 23:33:47. Contact: ###-####. still need fix hand rail and temp glass in bathroom ok to occ. 10/23/2001 2:15:52 PM
BLD01-02756 BLD-Footing10/23/200110/23/200110/23/2001 12:00:00 AMPPART
###-#### first section footing and walls will be poured in sections becouse of ext structure 10/23/2001 1:47:15 PM
BLD01-00806 BLD-Final10/23/200110/23/200110/23/2001 12:00:00 AMPCANC
###-#### greg