BLD01-02001
| BLD-Aging Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | | DONE |
|
|
|
BLD01-01986
| BLD-Aging Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | | DONE |
|
|
|
BLD01-02431
| BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | PASS |
|
|
###-#### DREW
|
BLD01-02514
| BLD-Footing | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | PASS |
|
|
###-#### ED north end 10/23/2001 9:27:55 AM
|
BLD01-02555
| BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | FAIL |
|
|
###-#### DAVID needs elec and plumbing also needs fire stopping in floor 10/23/2001 11:58:14 AM
|
BLD01-02292
| BLD-Framing/Rough-in | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | PASS |
|
|
SHEER WALL ###-#### DAVID nailing on sheet rock in dressing room 10/23/2001 10:57:14 AM
|
BLD01-01994
| BLD-Footing | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | PASS |
|
|
###-#### mti inspecting rebar and concrete 10/23/2001 9:52:00 AM
|
BLD01-02431
| BLD-Energy code compliance | 10/23/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 425 On 10/23/2001 9:31:21 AM
|
BLD01-02125
| BLD-Final | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | P | PASS |
|
|
###-#### WALT
|
BLD01-01275
| BLD-Final | 10/22/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/22/2001 at 23:33:47. Contact: ###-####. still need fix hand rail and temp glass in bathroom ok to occ. 10/23/2001 2:15:52 PM
|
BLD01-02756
| BLD-Footing | 10/23/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | P | PART |
|
|
###-#### first section footing and walls will be poured in sections becouse of ext structure 10/23/2001 1:47:15 PM
|
BLD01-00806
| BLD-Final | 10/23/2001 | 10/23/2001 | 10/23/2001 12:00:00 AM | P | CANC |
|
|
###-#### greg
|