BLD02-01801
| BLD-Framing/Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | A | FAIL |
|
|
###-####; Phone #: ###-#### Internet Inspection Request from: Rita DeYoungpos 10/23/2002 11:06:42 AM ted c/n. 10/23/2002 11:06:57 AM
|
BLD02-01435
| BLD-Final | 10/22/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | A | PASS |
|
|
###-####ok perm oc. 10/23/2002 2:55:29 PM
|
BLD02-01461
| BLD-Framing/Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | A | FAIL |
|
|
###-####. posted c/n. 10/23/2002 4:18:19 PM
|
MEC01-03149
| Final | 10/21/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | A | FAIL |
|
|
###-####. stove ok , but this has new gas line with no pressure test from us or mountain fuel. home owner on site. 10/23/2002 2:16:19 PM 10/23/2002 2:17:22 PM
|
BLD02-02030
| BLD-Other | 10/22/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 13:32:30. Contact: ###-####.ceiling ok . 10/23/2002 9:38:30 AM
|
BLD02-01600
| BLD-Final | 10/22/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | P | PART |
|
|
Don Bryan, ###-####temp oc ,needs plumbing ok for a perm. 10/23/2002 4:57:44 PM
|
MEC02-02664
| Final | 10/21/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | P | FAIL |
|
|
###-#### c/n , for duct sealing air tight,insulation at exposed duct metal. 10/23/2002 4:59:42 PM
|
MEC02-03084
| Pressure Test | 10/23/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 10:29:32. Contact: ###-####. guage not at 20 psi left c/n. 10/23/2002 4:02:21 PM
|
BLD02-01601
| BLD-Final | 10/23/2002 | 10/23/2002 | 10/23/2002 12:00:00 AM | P | PASS |
|
|
Don Bryan, ###-####ok perm oc. 10/23/2002 4:57:58 PM
|