FIR06-00463
| INSP-Sprinkler Rough-in/Hydro | 10/23/2006 | 10/23/2006 | 10/23/2006 4:40:04 PM | P | FAIL |
|
|
AG hydrostatic test of the wet system failed due to approx. 9psi pressure loss and a leak at one location. The dry system gauge read below 200psi at the conclusion of the test. Also noted 24hr air test needs to be completed for the dry system.
|
FIR06-00303
| INSP-Sprinkler Rough-in/Hydro | 10/23/2006 | 10/23/2006 | 10/23/2006 4:34:05 PM | P | PART |
|
|
UG hydrostatic test passed.
|
FIR06-00672
| INSP-Sprinkler Rough-in | 10/23/2006 | 10/23/2006 | 10/23/2006 4:33:17 PM | P | PART |
|
|
Partial inspection for the OH rough-in due to several areas not completed, missing EQ bracing at the end main, FDC and top of riser, drops are not installed at some locations, main and branch line installation is acceptable, noted areas at columns and soffits which may present obstructions, 130ft2 spacing to be verified when heads are cut in, UG supply and riser are not completed at this time.
|
FIR06-00104
| INSP-Alarm Testing | 10/20/2006 | 10/23/2006 | 10/23/2006 4:27:45 PM | P | CANC |
|
|
Inspection rescheduled due to time constraints.
|
BLD06-01634
| FIRE-Final Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 4:27:08 PM | P | NR |
|
|
Project is not ready for life safety final inspection.
|
BLD06-01953
| FIRE-Final Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 4:26:25 PM | P | PASS |
|
|
Visual indicator and signage above the main entry/exit to be verified at structural final.
|
BLD06-02515
| FIRE-Conference | 10/20/2006 | 10/23/2006 | 10/23/2006 4:24:49 PM | P | DONE |
|
|
On site confrence to discuss fire code review notes.
|
FIR06-00788
| INSP-Final Inspection | 10/16/2006 | 10/23/2006 | 10/23/2006 4:13:51 PM | P | FAIL |
|
|
Initiation of the hood suppression system failed to activate the building fire alarm, need to relocate the manual pull station away from the hood.
|
FIR06-00799
| INSP-Final Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 12:53:10 PM | P | PASS |
|
|
Sprinkler heads have been relocated to the proper position per scope of work, no access provided above ceiling for verification of attatchment means.
|
FIR06-00641
| INSP-Sprinkler Rough-in | 10/19/2006 | 10/23/2006 | 10/23/2006 12:51:02 PM | A | PART |
|
|
UG hydrostatic test for the fire supply line passed for building address 7960. Requested contractor to call in the correct address and permit number for this inspection activity completed today.
|
FIR06-00450
| INSP-Sprinkler Rough-in | 10/20/2006 | 10/23/2006 | 10/23/2006 12:44:29 PM | A | FAIL |
|
|
Four heads in the confrence room are supplied by a one inch line which appears to exceed the allowable calcs for this area, one area as marked on approved plans is not ready for inspection at this time.
|
FIR06-00090
| INSP-Final Inspection | 10/20/2006 | 10/23/2006 | 10/23/2006 12:41:20 PM | A | PASS |
|
|
Permitted fire sprinkler work is satisfactory, inspection passed.
|
FIR06-00668
| INSP-Final Inspection | 10/17/2006 | 10/23/2006 | 10/23/2006 8:48:59 AM | A | FAIL |
|
|
Manual pull stations at two locations within the area of work (NE and NW exits) are mounted too high, wall mounted notification devices at two hallways south of the TI area adjacent to open office areas are not in sync with the new ceiling AV's per contractor and are below min. height AFF. Provide approved plans on site at next inspection. Notified contractor to provide plans reflecting any changes on resubmittals or as-builts with inspectors approval.
|