ESC07-00513
| Tracking Control | 10/23/2007 | 10/23/2007 | 10/23/2007 7:43:42 AM | A | PART |
|
|
Correction to contractor; Need full coverage of rock at soil stockpile area across the street. Also, top dressing at main site. Reminded contractor that stockpile soils will need to be stablized with an approved method after transported of material is completed.
|