Inspections for the day of: Friday, October 23, 2009.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl Spivey
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS09-00202 PLM-Conference10/23/200910/23/200910/23/2009 3:15:34 PMPPASS
Remodeled bathrroms ( main and master) which was contracted by Disaster Cleanup (###-####) foreman named Darrell. Subcontracted plumbing to John Hensley at Workhorse Plumbing. Master was remodeled changing shower to a jetted tub with shower, moved lav and replaced with all new fixtures ( toilet and lav). Main bath was remodeled with changeout to jetted tub with shower and new toilet and lav. no permits taken out. Met with homeowners(Mike Cambell) and called and talked to John Hensley. Civil penalty warning will be sent to John.......................ds
PLM09-01826 Water Heater Final10/23/200910/23/200910/23/2009 1:47:45 PMPPASS
please call jeff before going at ###-####. thanks! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne
PLM09-01825 Water and/or Sewer10/22/200910/23/200910/23/2009 11:03:21 AMAPART
bob Phone #: ###-####
sewer ok..........water not ran and floor drain not plumbed to sanitary per code........not allowed to drain into ground...........ds