FIR09-00606
| INSP-Final Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 5:12:57 PM | P | PASS |
|
|
Fire sprinkler permit passed final inspection.
|
FIR09-00606
| INSP-Sprinkler Rough-in | 10/23/2009 | 10/23/2009 | 10/23/2009 5:11:31 PM | P | PART |
|
|
Overhead fire sprinkler modifications are approved for cover.
|
FIR09-00364
| INSP-Sprinkler Rough-in | 10/23/2009 | 10/23/2009 | 10/23/2009 5:09:29 PM | P | PART |
|
|
Todd Phone#: ###-####
|
FIR09-00479
| INSP-Sprinkler Rough-in/Hydro | 10/23/2009 | 10/23/2009 | 10/23/2009 5:09:17 PM | A | PART |
|
|
See notes on stamped plan set.
|
FIR09-00592
| INSP-Final Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 5:08:49 PM | A | PASS |
|
|
Fire sprinkler permit okayed for final.
|
BLD09-01127
| FIRE-Final Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 1:08:42 PM | P | PASS |
|
|
C/N items field verified for completion, fire life safety okay for final, lever hardware at the two back doors to be installed prior to final per plans and as discussed.
|
FIR09-00613
| INSP-Conference | 10/23/2009 | 10/23/2009 | 10/23/2009 12:33:37 PM | A | DONE |
|
|
Regarding site inspection schedule for work completed.
|
BLD09-01139
| FIRE-Final Inspection | 10/22/2009 | 10/23/2009 | 10/23/2009 12:32:32 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD09-01139
| FIRE-Final Inspection | 10/23/2009 | 10/23/2009 | 10/23/2009 12:31:55 PM | A | PASS |
|
|
Reinspection for correction item passed.
|