Inspections for the day of: Tuesday, October 23, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00506 INSP-Final Inspection10/22/201210/23/201210/23/2012 3:48:49 PMPCANC
Per Glen inspection is to be rescheduled for tomorrow with the fire alarm inspection.
FIR12-00494 INSP-Sprinkler Rough-in10/23/201210/23/201210/23/2012 3:39:12 PMPPASS
ok to cover at the previously marked corrections
FIR12-00611 INSP-Sprinkler Rough-in10/23/201210/23/201210/23/2012 3:16:57 PMPPASS
Rough-in inspection passed. Piping can be covered.
FIR12-00589 INSP-Sprinkler Rough-in10/22/201210/23/201210/23/2012 3:16:14 PMPPASS
Rough-in inspection passed. Piping can be covered.
FIR12-00543 INSP-Final Inspection10/22/201210/23/201210/23/2012 3:15:10 PMAFAIL
Project is not ready for a final inspectio due to the ceiling tile has not been installed. Rough-in inspection has passed and the piping can now be covered.
BLD12-02729 FIRE-Final Inspection10/19/201210/23/201210/23/2012 11:31:54 AMAPASS
Life safety passed
FIR12-00561 INSP-Final Inspection10/22/201210/23/201210/23/2012 11:30:51 AMAFAIL
The audilbe and visual fire alarm devices shall be syncronized as per NFPA 72, sections 18.4.2.5 and 18.5.4.3.2. (the new devices do not audibly sync with the existing devices) Also corrected as-builts are needed showing the candella changes.
BLD12-02695 FIRE-Final Inspection10/22/201210/23/201210/23/2012 9:40:06 AMAFAIL
Provide exit signs/emergency lights as per the approved plans, provide approved single action hardware on all doors as per the approved plans, provide fire extinguishers as discussed.
FIR12-00394 FIR-Aging Inspection10/23/201210/23/201210/23/2012 8:27:42 AM NR
Brodie stated he would follow up on the job status.