FIR14-00474
| INSP-Sprinkler Rough-in/Hydro | 10/23/2014 | 10/23/2014 | 10/23/2014 3:37:09 PM | P | PASS |
|
|
Remaining hardlids ok to be installed and cover piping
|
FIR14-00419
| INSP-Sprinkler Rough-in/Hydro | 10/23/2014 | 10/23/2014 | 10/23/2014 3:35:30 PM | P | FAIL |
|
|
Overhead hydro test failed
|
FIR14-00418
| INSP-Sprinkler Rough-in/Hydro | 10/23/2014 | 10/23/2014 | 10/23/2014 3:35:06 PM | P | FAIL |
|
|
Overhead hydro test failed
|
FIR14-00417
| INSP-Sprinkler Rough-in/Hydro | 10/23/2014 | 10/23/2014 | 10/23/2014 3:34:45 PM | P | FAIL |
|
|
Overhead hydro test failed
|
FIR14-00397
| INSP-Sprinkler Rough-in | 10/23/2014 | 10/23/2014 | 10/23/2014 2:55:52 PM | P | FAIL |
|
|
Tenting still has not been repaired.. No piping can be covered.
|
FIR14-00710
| INSP-Final Inspection | 10/23/2014 | 10/23/2014 | 10/23/2014 2:53:02 PM | P | FAIL |
|
|
Provide as-builts as per the approved plans with corrected zone numbers
|
FIR14-00707
| INSP-Final Inspection | 10/23/2014 | 10/23/2014 | 10/23/2014 2:52:24 PM | P | FAIL |
|
|
Provide signage for fire riser room as per approved plans.
|
FIR13-00697
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 2:47:37 PM | A | FAIL |
|
|
24 hour air test fialed.
|
FIR14-00354
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 2:46:58 PM | A | PASS |
|
|
Permit finaled
|
FIR14-00667
| INSP-Sprinkler Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 10:12:24 AM | A | PASS |
|
|
started 24 hr air test with marked guage at 8:00am
|
BLD14-03050
| FIRE-Final Inspection | 10/22/2014 | 10/23/2014 | 10/23/2014 10:00:58 AM | A | PASS |
|
|
Life safety passed. Owner is going to remove the non-required/non-fuctional exit sign prior to a building inspection.
|
BLD13-02019
| FIRE-Final Inspection | 10/21/2014 | 10/23/2014 | 10/23/2014 9:46:23 AM | A | PASS |
|
|
Life safety passed
|
FIR14-00632
| INSP-Final Inspection | 10/22/2014 | 10/23/2014 | 10/23/2014 9:45:54 AM | A | PASS |
|
|
Permit finaled
|