MEC14-04598
| Rough-in | 10/23/2014 | 10/23/2014 | 10/23/2014 3:57:37 PM | P | PASS |
|
|
Oleg-fireplace Phone #: ###-#### fireplace ok
|
MEC14-04598
| Pressure Test | 10/23/2014 | 10/23/2014 | 10/23/2014 3:56:37 PM | P | PASS |
|
|
Oleg Phone #: ###-#### flue test ok, 20# gas test
|
MEC14-04598
| Rough-in | 10/23/2014 | 10/23/2014 | 10/23/2014 3:55:04 PM | P | PASS |
|
|
Oleg Phone #: ###-####
|
MEC14-04599
| Final | 10/23/2014 | 10/23/2014 | 10/23/2014 3:21:35 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Doug Turner need approval from manufacturer of furnace and water heater to allow power venting appliane installed. Need installation instructions for the power venting fan.
|
MEC14-04597
| Conference | 10/22/2014 | 10/23/2014 | 10/23/2014 2:47:30 PM | P | DONE |
|
|
Ken-would like you to meet him in the later afternoon. he said between 2 & 3 would be best Phone #: ###-#### met with owner to discuss gas piping requirements from house to garage
|
MEC14-04589
| Final | 10/23/2014 | 10/23/2014 | 10/23/2014 2:09:54 PM | P | CANC |
|
|
Please Call Dwight ###-#### @ Jims Heating Prior To Inspection Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna Inspection cancelled from web by: Manuel Acuna
|
MEC14-04188
| Conference | 10/23/2014 | 10/23/2014 | 10/23/2014 2:05:31 PM | P | DONE |
|
|
1:15 in the alley. meet architect about equipment protection. met architect to discuss building platform at rtu and a railing to the rtu on flat room at roof edge. Architect to email detail drawing of platform.
|