BLD14-00923
| BLD-Framing/Rough-in | 10/21/2014 | 10/23/2014 | 10/23/2014 3:07:25 PM | P | NR |
|
|
call before to meet // David Phone #: ###-#### No plans onsite.
|
GCB14-00082
| GCB-Final | 10/22/2014 | 10/23/2014 | 10/23/2014 2:27:27 PM | P | PASS |
|
|
Greg ###-#### Structual final only
|
BLD14-02007
| BLD-Wall Bracing | 10/22/2014 | 10/23/2014 | 10/23/2014 11:23:07 AM | A | PASS |
|
|
Ron Phone #: ###-####
|
BLD14-02008
| BLD-Wall Bracing | 10/22/2014 | 10/23/2014 | 10/23/2014 11:22:48 AM | A | PASS |
|
|
Ron Phone #: ###-####
|
BLD14-02982
| BLD-Foundation | 10/22/2014 | 10/23/2014 | 10/23/2014 10:13:20 AM | A | CANC |
|
|
Juan-pour time 11:00 Phone #: ###-####
|
BLD14-02982
| BLD-Footing | 10/23/2014 | 10/23/2014 | 10/23/2014 10:13:07 AM | P | PASS |
|
|
Juan-pour time 11:00 Phone #: ###-####
|
BLD14-02343
| BLD-Wall Bracing | 10/22/2014 | 10/23/2014 | 10/23/2014 9:45:20 AM | A | PASS |
|
|
interior shear,, Kevin Phone #: ###-####
|
BLD14-02707
| BLD-Energy code compliance | 10/22/2014 | 10/23/2014 | 10/23/2014 9:16:46 AM | A | PASS |
|
|
gabe - call 15 mins prior to meet Phone #: ###-####
|
BLD13-02668
| BLD-Final | 10/22/2014 | 10/23/2014 | 10/22/2014 11:00:31 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|