ESC15-00320
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 3:20:57 PM | | PASS |
|
|
No construction activity in old waste treatment pond at time of inspection. No trackout from entrance. Permits posted.
|
ESC15-00556
| Conference | 10/23/2015 | 10/23/2015 | 10/23/2015 2:47:31 PM | P | DONE |
|
|
Work has resumed in East Valley Sub phase #2. Monday 10/26 meeting has been planned to discuss winterization and stabilization BMPs with RP including restricting access to area off HV road and providing stormwater channel.
|
ESC15-00310
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 2:44:51 PM | | PEND |
|
|
Need to complete cleanup of staging areas. Popeyes is now open for business. No loose sediment of offsite discharges....will check for Final next week
|
ESC15-00104
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 2:36:51 PM | | PASS |
|
|
|
ESC15-00497
| Aging Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 2:20:43 PM | | PASS |
|
|
Pool construction complete. No loose sediment or materials on site. ESC permit closed.
|
ESC15-00497
| DOC - Permit Finaled | 10/23/2015 | 10/23/2015 | 10/23/2015 2:19:54 PM | P | PASS |
|
|
|
ESC15-00282
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 2:06:19 PM | | PASS |
|
|
No activity
|
ESC15-00827
| Site Final | 10/20/2015 | 10/23/2015 | 10/23/2015 1:32:50 PM | P | PASS |
|
|
Check for completion of exterior trench work and site cleanup....project near completion per Ross Tucker with CM company...
Trench has been filled in and paved over. Loose sediment swept and cleaned around site. No further construction. ESC permit conditions satisfied.
|
ESC15-00599
| Aging Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 1:14:01 PM | | PASS |
|
|
Work complete and the disturbed areas are stabilzed. No loose sediment or other materials remaining onsite. ESC conditions satisfied, all permits finaled.
|
ESC15-00599
| DOC - Permit Finaled | 10/23/2015 | 10/23/2015 | 10/23/2015 1:12:36 PM | P | PASS |
|
|
|
ESC15-00368
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 12:03:28 PM | | PASS |
|
|
|
ESC14-00769
| Site Preparation | 10/22/2015 | 10/23/2015 | 10/23/2015 11:58:18 AM | A | PART |
|
|
Cameron Phone #: ###-####
Permit signs on site. Subdivision BMPs are installed. Active projects adjacent are in compliance. Lot ready for excavation,
|
ESC14-00770
| Site Preparation | 10/22/2015 | 10/23/2015 | 10/23/2015 11:58:02 AM | A | PASS |
|
|
Cameron Phone #: ###-####
Permit signs on site. Subdivision BMPs are installed. Active projects adjacent are in compliance. Lot ready for excavation,
|
ESC15-00405
| Site Final | 10/21/2015 | 10/23/2015 | 10/23/2015 11:45:57 AM | A | PASS |
|
|
Home complete. Streets have been cleaned, but ongoing work with some trackout will continue to be monitored on open permits in River Heights #6. The yard is landscaped and stabilized. All permits finaled.
|
ESC15-00402
| Site Final | 10/21/2015 | 10/23/2015 | 10/23/2015 11:45:39 AM | A | PASS |
|
|
Home complete. Streets have been cleaned, but ongoing work with some trackout will continue to be monitored on open permits in River Heights #6. The yard is landscaped and stabilized. All permits finaled.
|
ESC15-00402
| DOC - Permit Finaled | 10/23/2015 | 10/23/2015 | 10/23/2015 11:44:21 AM | P | PASS |
|
|
|
ESC15-00368
| Site Final | 10/23/2015 | 10/23/2015 | 10/23/2015 11:42:34 AM | P | PASS |
|
|
Home construction complete. Yard is landscaped & stabilized and home is occupied. Surrounding hillside vegetation has been preserved. No ESC issues, hillside bond issued.
|
ESC15-00812
| Random Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 11:38:26 AM | P | PASS |
|
|
WIP. No violations observed at site. Early start and rough grading related ESC permit is now finaled (ESC15-00861). Project will now be inspected under this ESC permit. Approved.
|
ESC15-00861
| Site Final | 10/23/2015 | 10/23/2015 | 10/23/2015 11:37:03 AM | P | PASS |
|
|
Rough grading phase of project complete. Site has permit posted, no trackout, discharges, or other issues. Vertical construction now in progress and covered under ESC15-00812
|
ESC15-00094
| Conference | 10/22/2015 | 10/23/2015 | 10/23/2015 11:01:57 AM | A | PART |
|
|
Landscaping crew access backyard of home through open area of BH#6 off Echo culdesac causing some trackout. Topsoil stockpiled adjacent to sidewalk,
Warning and request issued to onsite foreman of irrigation installation company to clean up mud clud and tracks on sidewalk and gutter. Also to sweep up and contain stockpile.
Project management is by Gossett Landscaping.
|
ESC15-01399
| Site Preparation | 10/23/2015 | 10/23/2015 | 10/23/2015 11:01:57 AM | A | PASS |
|
|
10 AM David Gordon
First phase of project to begin at Quarry View Park and consists of improvement of the Hot Springs trail.
Permit sign to be posted at start of project off Bacon Street path access. Roadmix and topsoil mix will be imported to improve trail drianage and prevent mud during wet periods for all season use.
BMPs will be stockpile management , flat area of disturbance with low erosion risk. Vegetation surrounding trail will be preserved. Initial access will be at parking lot of QV park and across grass. Subcontractor on agreement with Parks to restore any damage grass or ruts from vehicles.
Approved. Hillside Park phase of project will start in 1-2 weeks.
|
ESC15-00358
| General Inspection | 10/23/2015 | 10/23/2015 | 10/23/2015 9:01:13 AM | | PASS |
|
|
WIP. No sediment trackout or housekeeping violations at site.
|