Inspections for the day of: Wednesday, October 23, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00429 Site Final10/23/201910/23/201910/29/2019 2:46:10 PMPNR
check for DI bags still in roundabout; remind RP they need to be pulled

RP Curt notified to remove DI bags. He said he will get it done. Will check back.
ESC18-01238 Aging Inspection10/23/201910/23/201910/24/2019 4:58:41 PM CANC
ESC17-01009 General Inspection10/23/201910/23/201910/24/2019 4:47:35 PM PASS
ESC19-00574 General Inspection10/22/201910/23/201910/24/2019 10:38:19 AMAPART
9 AM w/ public works

No trackout to VMP or outside of Lander Street staging area. Dry conditions, no discharges occuring from site. Dewatering pump currently not on. SWPPP has turbidity records, no results > 2 NTU, no plumes noted at pond inlet from settling trough. Permit sign and SWPPP information posted on Lander. SWPPP binder and map located in job trailer. Warner construction on site working on the east entrance to VMP. No dust or other issues. Stabilzed access road of pit run installed through the site

Corrections needed:

- update SWPPP site map to show current conditions, update grading and stabilization log. See notes in SWPPP from PW Inspector Tiffany.

- concretre washout is ovef 75% capacity, new washout pan should be provided, have a sign, and stabilized (mud free) access for.

- Silt fence on south side of Willow Lane Pond should be re-assessed, there is a gap in fence in what appears to be the low point of the perimeter. If area is to be stabilized, Silt fence may not be required.

- Implement stabilization for areas that are now at final grade (track slopes on VMP access ramp sides), hydroseed , cover exposed areas; is perimeter wattle needed at toe of ramp slope south of the VMP entrance?

- Need to lengthen construction entrance track pad (or replace/relocate) to a minimum 50 ft length, per installation details in SWPPP

- sweep impervious areas of the Lander Street staging and entrance area.

- plan ahead for a stabilzed employee parking area.

Follow up inspection scheduled. RP Dustin w/ McAlvain notified.
ESC18-00863 Aging Inspection10/23/201910/23/201910/23/2019 8:37:58 AM CANC
ESC18-00429 General Inspection10/23/201910/23/201910/23/2019 8:16:59 AM CANC
ESC18-01465 Aging Inspection10/23/201910/23/201910/23/2019 8:15:57 AM DEFR
inspected by BLD inspector
ESC18-01233 Aging Inspection10/23/201910/23/201910/23/2019 8:15:40 AM DEFR
inspected by BLD inspector