PLM95-00807
| INSP - Sewer line | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | | PART |
|
|
/ / 330 - plus 13'
|
PLM95-00807
| INSP - Sewer line | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | | PART |
|
|
/ / 330 - poured manhole plus 13'
|
PLM95-01413
| INSP - Ground work | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | | NR |
|
|
/ / 330 -
|
PLM95-01414
| INSP - Framing/ Rough-in | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | | PASS |
|
|
/ / 330 - 1-wc,1-lav,1-sh,1-si,1-wh
|
PLM95-01350
| INSP - Water lines | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | | PASS |
|
|
/ / 330 -
|
PLM95-01407
| INSP - Sewer and Water lines | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | FAIL |
|
|
10/24/95 330 - correction: remove sdr 35 from inside foundation. left no
|
PLM95-01413
| INSP - Ground work | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | FAIL |
|
|
10/24/95 330 - no test
|
PLM95-01416
| INSP - Plumbing Rough-in | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | PASS |
|
|
10/24/95 330 - 1 W/C 1 BASIN 1 SHOWER r/i ok with poly tested to 150 psi
|
PLM95-01429
| INSP - Sewer line | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | PASS |
|
|
10/24/95 330 - THIS IS A DUPLEX///2 SEWER LINES//DIX
|
PLM95-01197
| INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | NR |
|
|
10/24/95 330 - INDUSTRIAL WAST FAB 1 CONTACT MIKE KELLY AT ###-####
|
PLM4047279
| INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | PASS |
|
|
10/24/95 330 - 4-wc,5-lav,1-tub,3-sh,2-si,1-wb,2-wh
|
PLM95-00699
| INSP - Plumbing Rough-in | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | FAIL |
|
|
10/24/95 330 - correction: water waste and vent test failed, hang 2" abs replace bad fitting in basement waste. left notice.
|