PLM95-00800
| INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | A | PASS |
|
|
10/23/95 347 - fixture count w/c 2 basin 2 tub 1 shr 1 sink 1 washer 1 w/h 1
|
PLM95-00815
| INSP - Plumbing Rough-in | 10/23/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | A | FAIL |
|
|
10/23/95 347 - please call genna to schedule a time//###-#### INSTRUCTED VERBALLY AND WITH DRAWINGS AS TO THE PROPER INSTALLATION CRIT FOR THIS JOB. SHE WILL CALL FOR A "DRY FIT" INSPECTION SO AS TO CHECK F BEFORE GLUING.
|
PLM95-01409
| INSP - Sewer and Water lines | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | PASS |
|
|
10/24/95 347 -
|
PLM95-01423
| INSP - Water softener | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | NH |
|
|
10/24/95 347 - ###-####- FOR ACCESS XXXXXXXXXXXXXXXX NO ANSWER XXXXXXXXXX
|
PLM95-01428
| INSP - Plumbing Rough-in | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | FAIL |
|
|
10/24/95 347 - W/C 2 BASIN 2 TUB 2 SINK 1 A/W 1 W/H 1 XXXXXXXXXXXX CORRECTION NOTICE UPC IAPMO INSTALLATION STANDARDS #22.6 PAR
|
PLM95-00530
| INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 12:00:00 AM | P | PASS |
|
|
10/24/95 347 - FIXTURE COUNT W/C 3 BASIN 4 TUB 2 SINK 1 WASHER 1 W/H 1 SMALL BUBBLES IN CAULK UP MSTR BATH TUB SPOUT AND RIGHT HAND LAV LEFT NO
|