BLD99-01067
| BLD-Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PASS |
|
|
FN- CLAY- ###-#### ; card to cont 10/24/2000 11:53:45 AM
|
BLD00-01688
| BLD-Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | FAIL |
|
|
TOM HAS NO PHONE BUT WILL BE ON THE JOB SITE; c/n, ADA restrooms, complete door install, wall surfaces at restroom, etc. ok for t/o. 10/24/2000 11:21:28 AM
|
BLD00-02901
| BLD-Footing | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PART |
|
|
Kiwi ###-#### habitat for humanity job 10/24/2000 12:04:27 PM
|
BLD00-02528
| BLD-Energy code compliance | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PASS |
|
|
###-####; remove ext vapor barrier, ok to cover 10/24/2000 10:36:56 AM
|
BLD00-02386
| BLD-Conference | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/24/2000 w/ Linda re permit...no insps noted for struct
|
BLD00-01786
| BLD-Concrete | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
grout and rebar Bill ###-#### ok pending report, strat 10/24/2000 4:15:33 PM a onsite 10/24/2000 4:15:38 PM
|
BLD00-02358
| BLD-Energy code compliance | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
###-####; insul ok chk floor at final, recall reinsp for frame 10/24/2000 5:06:32 PM
|
BLD00-02007
| BLD-Final | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | FAIL |
|
|
###-#### ENTRY CODE 1001, garage door inoperative 10/24/2000 5:07:13 PM
|
BLD00-01366
| BLD-Framing/Rough-in | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/24/2000 roof w.i.p. ok to dry in
|
BLD00-02358
| BLD-Framing/Rough-in | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 10/24/2000 keep c/n
|
BLD00-00832
| BLD-Conference | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/24/2000 w/ bldr re final
|
BLD00-02385
| BLD-Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PASS |
|
|
FN OCC-- SHANNON ###-#### ; card to contractor 10/24/2000 3:56:30 PM
|
BLD00-02514
| BLD-Framing/Rough-in | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 16:49:11. Contact: ###-####.add gyp over plywood at lids; complete connections at eng'd storefront. ok to continue 10/24/2000 3:34:40 PM
|
BLD00-00837
| BLD-Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/23/2000 at 21:56:45. Contact: ###-####. no acce 10/24/2000 4:27:43 PM ss 10/24/2000 4:27:47 PM
|
BLD99-01836
| BLD-Final | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PASS |
|
|
###-#### CLAY
|