ELE00-03629
| Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | CANC |
|
|
FN- FOR HOMEOWNER- WILLIE- ###-####. request should have been for ele r/i; garage. 10/24/2000 11:34:33 AM
|
ELE00-04097
| Electrical Rough-In | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PASS |
|
|
kathy ###-#### 6 rooms and a a/c only-NO service. garage ele r/i. 10/24/2000 11:37:12 AM
|
ELE00-03652
| Final | 10/23/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PASS |
|
|
FN- - ###-####- PAT OR CELL ###-####. disconnects for blowers at car-wash. 10/24/2000 11:45:06 AM
|
ELE00-03629
| Electrical Rough-In | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 10/24/2000 garage ele r/i; two stories.
|
ELE00-04009
| Final | 10/20/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
JAMES-- CELL ###-#### FN. new service panel connection to power only; sub-panel not completed. 10/24/2000 9:56:40 PM
|
ELE00-02622
| Final | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
###-####. outside light fixtures to be hung when stucco exterior dries. contractor will call in for complete final. 10/24/2000 9:54:11 PM
|
ELE00-02998
| Final | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | FAIL |
|
|
FN INSP- STEVE ###-####. corrections not completed. reinspection fee charged; called contractor. 10/24/2000 9:55:16 PM
|
ELE00-01081
| Final | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/24/2000 at 09:32:35. Contact: ###-####. installed shunt-trip disconnect in elevator pit. 10/24/2000 9:52:11 PM
|
ELE00-04113
| Temporary Service | 10/24/2000 | 10/24/2000 | 10/24/2000 12:00:00 AM | P | PASS |
|
|
T/P CHRIS ###-####-- CALL 1ST BEFORE INSP FOR DIREC. temporary service pole. 10/25/2000 10:47:22 AM
|