BLD00-03038
| BLD-Framing/Rough-in | 10/23/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 12:23:41. Contact: ###-####. exterior ok for cover. 10/24/2001 11:14:20 AM
|
BLD01-00644
| BLD-Conference | 10/23/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | A | PASS |
|
|
###-#### fire blk/ fire stopping and shaft. 10/24/2001 3:44:31 PM
|
BLD01-01442
| BLD-Final | 10/23/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS c/n on site. 10/24/2001 4:05:36 PM
|
BLD01-01855
| BLD-Final | 10/23/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS no access wet floor. 10/24/2001 4:07:38 PM
|
BLD00-03428
| BLD-Foundation | 10/24/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | P | PART |
|
|
###-#### CALVIN east /south ft placed with special insp.pending report. 10/24/2001 4:54:35 PM
|
BLD01-01729
| BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | P | FAIL |
|
|
###-#### nailling not done/ missing floor to floor straps west wall. 10/24/2001 4:15:13 PM
|
BLD00-02920
| FIRE-Conference | 10/24/2001 | 10/24/2001 | 10/24/2001 12:00:00 AM | P | PART |
|
|
fire penatration wall hazzards bunk walk hugo ###-#### 1/2 of assemblie ok to proceed with closer. 10/24/2001 2:42:40 PM
|