MIS02-00259
| BLD-Conference | 10/22/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | NH |
|
|
KATIE ###-#### CARL, THIS IS ONE CAN OF WORMS ...PLEASE CALL KATIE FIRST BEFORE YOU GO OUT AS SHE NEEDS TO TALK TO YOU ON THIS.... HOME PHONE # ###-####...left msg... 10/23/02 5:45:00 PM
|
BLD01-01347
| BLD-Framing/Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 08:54:58. Contact: ###-####....walls, firestops ok at storage areas, c/n re perimeter wires etc..ok to continue, chk at final.... 10/24/02 12:34:16 PM
|
MEC02-00914
| Final | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 11:40:48. Contact: ###-####....previously ok'd by 420... 10/24/02 6:29:08 PM
|
BLD02-02547
| BLD-Framing/Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 11:57:31. Contact: ###-####.
|
BLD02-01930
| BLD-Framing/Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PART |
|
|
###-#### dennis...grid ok, to tile 10/24/02 9:22:59 AM
|
BLD02-02080
| BLD-Framing/Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | FAIL |
|
|
###-#### c/n, straps , air seal,, energy compliance?? ok to insul. 10/24/02 6:25:46 PM
|
BLD02-00348
| BLD-Footing | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PART |
|
|
###-#### brett ...ftgs originally poured w/ prior Idanha upgrade....matched t 10/24/02 11:01:27 AM ose details, foundation ext to grade ok pending ACHD permit...This is being called a pedestrian walkway??? Its a patio cover type structure. 10/24/02 11:02:46 AM
|
MEC02-03086
| Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 17:09:11. Contact: ###-####.
|
MEC02-03086
| Pressure Test | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 17:09:37. Contact: ###-####.
|
MIS02-00259
| BLD-Conference | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
katie 3849882, 4099883...c/n issued for owner... reroof & window work including "bay" done w/o permit/insp...bay appears to have cracked, poor framing...no fnd... 10/24/02 10:12:56 AM
|
BLD02-00320
| BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-00798
| BLD-Framing/Rough-in | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PART |
|
|
ceiling; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...bsmt ok, add firestops at pipes... 10/24/02 6:19:50 PM
|
BLD02-02543
| BLD-Footing | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 10:13:27. Contact: ###-####....c/n, nr, rebar. 10/24/02 2:16:37 PM
|
BLD02-01833
| BLD-Energy code compliance | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
late pm ###-####
|
BLD02-00283
| BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-02284
| BLD-Energy code compliance | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
c/n ok
|
BLD02-01833
| BLD-Framing/Rough-in | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PART |
|
|
c/n ok, chk attic vents at final.
|
MEC02-00918
| Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | CANC |
|
|
|