MEC02-03052
| Final | 10/22/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | FAIL |
|
|
JENEFER ###-#### needs on off switch and light and light switch 10/24/2002 9:33:38 AM
|
BLD02-01923
| BLD-Foundation | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 11:13:55. Contact: ###-####.
|
MEC02-03089
| Rough-in | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | FAIL |
|
|
access in attic\\###-#### furnace in attic light switch elec out let cons drains passage way insulate boots and plenums 10/24/2002 11:34:05 AM
|
MEC02-03090
| Pressure Test | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | FAIL |
|
|
piping is onder sized line from meter to first funace ok but will not carry suply for second funace repipe 10/24/2002 11:36:46 AM
|
BLD02-02209
| BLD-Foundation | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 13:06:36. Contact: ###-####.
|
MEC02-00575
| Conference | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
please extend\\ ###-#### work in progress 10/24/2002 11:57:22 AM
|
BLD02-00144
| BLD-Conference | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | A | PASS |
|
|
wants to extend permit ok to extend work in progress 10/24/2002 11:57:54 AM
|
BLD02-01721
| BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 17:10:48. Contact: ###-####. ok fo temp occ tempered glass at top of landing second floor back stairs finish installing glass gaurd rail front stairs 10/24/2002 3:49:50 PM
|
BLD01-02513
| BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 17:15:02. Contact: ###-####.ok for c.o.c. 10/24/2002 3:44:04 PM
|
BLD02-01119
| BLD-Final | 10/23/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 19:27:49. Contact: ###-####.
|
BLD02-01472
| BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 07:05:53. Contact: ###-####.
|
BLD02-01850
| BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 07:07:07. Contact: ###-####.
|
BLD02-00283
| BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | FAIL |
|
|
###-#### needs elec and plumbing finals no inspection done at this time 10/24/2002 1:08:00 PM
|
BLD02-01649
| BLD-Framing/Rough-in | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 08:43:47. Contact: ###-####.c/n on site pok to insulate 10/24/2002 2:05:39 PM
|
MEC01-03238
| Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
call 15 min prior to going wade ###-####
|
MEC02-03052
| Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
fn insp -matt- ###-####
|
BLD02-01680
| BLD-Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-03030
| Final | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | P | PASS |
|
|
|