Inspections for the day of: Thursday, October 24, 2002.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-03052 Final10/22/200210/24/200210/24/2002 12:00:00 AMAFAIL
JENEFER ###-#### needs on off switch and light and light switch 10/24/2002 9:33:38 AM
BLD02-01923 BLD-Foundation10/23/200210/24/200210/24/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/23/2002 at 11:13:55. Contact: ###-####.
MEC02-03089 Rough-in10/23/200210/24/200210/24/2002 12:00:00 AMAFAIL
access in attic\\###-#### furnace in attic light switch elec out let cons drains passage way insulate boots and plenums 10/24/2002 11:34:05 AM
MEC02-03090 Pressure Test10/23/200210/24/200210/24/2002 12:00:00 AMAFAIL
piping is onder sized line from meter to first funace ok but will not carry suply for second funace repipe 10/24/2002 11:36:46 AM
BLD02-02209 BLD-Foundation10/23/200210/24/200210/24/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/23/2002 at 13:06:36. Contact: ###-####.
MEC02-00575 Conference10/23/200210/24/200210/24/2002 12:00:00 AMAPASS
please extend\\ ###-#### work in progress 10/24/2002 11:57:22 AM
BLD02-00144 BLD-Conference10/23/200210/24/200210/24/2002 12:00:00 AMAPASS
wants to extend permit ok to extend work in progress 10/24/2002 11:57:54 AM
BLD02-01721 BLD-Final10/23/200210/24/200210/24/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/23/2002 at 17:10:48. Contact: ###-####. ok fo temp occ tempered glass at top of landing second floor back stairs finish installing glass gaurd rail front stairs 10/24/2002 3:49:50 PM
BLD01-02513 BLD-Final10/23/200210/24/200210/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/23/2002 at 17:15:02. Contact: ###-####.ok for c.o.c. 10/24/2002 3:44:04 PM
BLD02-01119 BLD-Final10/23/200210/24/200210/24/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/23/2002 at 19:27:49. Contact: ###-####.
BLD02-01472 BLD-Final10/24/200210/24/200210/24/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 10/24/2002 at 07:05:53. Contact: ###-####.
BLD02-01850 BLD-Final10/24/200210/24/200210/24/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 10/24/2002 at 07:07:07. Contact: ###-####.
BLD02-00283 BLD-Final10/24/200210/24/200210/24/2002 12:00:00 AMPFAIL
###-#### needs elec and plumbing finals no inspection done at this time 10/24/2002 1:08:00 PM
BLD02-01649 BLD-Framing/Rough-in10/24/200210/24/200210/24/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/24/2002 at 08:43:47. Contact: ###-####.c/n on site pok to insulate 10/24/2002 2:05:39 PM
MEC01-03238 Final10/24/200210/24/200210/24/2002 12:00:00 AMPPASS
call 15 min prior to going wade ###-####
MEC02-03052 Final10/24/200210/24/200210/24/2002 12:00:00 AMPPASS
fn insp -matt- ###-####
BLD02-01680 BLD-Final10/24/200210/24/200210/24/2002 12:00:00 AMPPASS
MEC02-03030 Final10/24/200210/24/200210/24/2002 12:00:00 AMPPASS