BLD02-02293
| BLD-Grading Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | | PASS |
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD01-02877
| BLD-Grading Inspection | 10/24/2002 | 10/24/2002 | 10/24/2002 12:00:00 AM | | BOND |
|
|
Grading and drainage have been completed. Revegetation is not complete but a $400.00 bond has been submitted to ensure satisfactory completion. Therefore, the grading is conditionally approved.
|