Inspections for the day of: Tuesday, October 24, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS06-00208 MIS-Aging Inspection10/24/200610/24/200610/27/2006 1:41:19 PM NR
Inspection is being set up for monday
FIR06-00743 INSP-Sprinkler Rough-in10/24/200610/24/200610/24/2006 12:15:04 PMPPART
I gave the sprinkler contractor permission to cover the sprinkler piping but there are several outstanding issues still. No approved plans were on site so I could not verify if the corrected head spacing was alright. Also 8.0 K factor heads have been installed. I requested verification that the existing sprinkler system could support these heads. The fitter stated that Randy Knutson had already done this investigating. The annual inspection tag has not been updated at the riser.
FIR06-00736 INSP-Sprinkler Rough-in/Hydro10/24/200610/24/200610/24/2006 11:47:22 AMPPASS
Sprinkler rough-in passed, overhead piping is ok to cover
BLD06-01860 FIRE-Final Inspection10/23/200610/24/200610/24/2006 10:59:18 AMAFAIL
Provide suite number, exit discharge lighting at the front exit (rear exit is covered) and provide an indicator at the front exit.
FIR06-00626 INSP-Final Inspection10/23/200610/24/200610/24/2006 10:58:20 AMAPASS
permit finaled
FIR05-00832 INSP-Final Inspection10/23/200610/24/200610/24/2006 10:56:02 AMPCANC
Per James this permit will be rescheduled for tomorrow after the backflow preventor has been certified.
FIR06-00649 INSP-Final Inspection10/24/200610/24/200610/24/2006 10:55:07 AMPPASS
Permit finaled. Sample tubes have been corrected.
FIR06-00754 INSP-Sprinkler Rough-in10/24/200610/24/200610/24/2006 10:54:14 AMPPASS
Fire sprinkler rough-in passed
FIR06-00754 INSP-Final Inspection10/23/200610/24/200610/24/2006 10:53:46 AMAFAIL
No ceiling tile can not be finaled yet.
BLD06-00538 FIRE-Final Inspection10/23/200610/24/200610/24/2006 9:25:19 AMAFAIL
Install the door hardware for verification and repair the exit signs/emergency lights.
BLD06-00536 FIRE-Final Inspection10/23/200610/24/200610/24/2006 9:24:40 AMAPASS
Life safety finaled
FIR05-00536 INSP-Sprinkler Rough-in/Hydro10/23/200610/24/200610/24/2006 9:04:33 AMAPASS
Rough-in for the standpipe in stairwells #2 and #4 passed
MIS06-00226 FIR-Final10/23/200610/24/200610/24/2006 8:32:01 AMAPASS
Life safety finaled
FIR06-00515 INSP-Sprinkler Rough-in/Hydro10/23/200610/24/200610/24/2006 8:25:32 AMPPASS
Underground hydro test passed
FIR06-00515 INSP-Sprinkler Rough-in/Hydro10/23/200610/24/200610/24/2006 8:24:53 AMAPASS
Underground hydro test passed