Inspections for the day of: Tuesday, October 24, 2006.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00158 Complaint Inspection10/24/200610/24/200610/25/2006 1:11:00 PMPPART
Complaint from code enforcement about work without a permit. Found correction permit information and informed code enforcement (Carol) that necessary permit had been issued.
ESC06-00895 Site Final10/24/200610/24/200610/24/2006 2:15:14 PMPPASS
ESC06-01089 Site Final10/24/200610/24/200610/24/2006 2:15:09 PMPPASS
ESC05-01077 Tracking Control10/24/200610/24/200610/24/2006 10:30:03 AMPPASS
Site looks good.
ESC05-00927 Site Final10/24/200610/24/200610/24/2006 10:29:10 AMPPASS
Final stabilization has been completed.
ESC05-01035 Site Final10/24/200610/24/200610/24/2006 10:28:44 AMPPASS
Final stabilization has been completed.
ESC04-01374 Site Final10/24/200610/24/200610/24/2006 10:28:22 AMPPASS
Final stabilization has been completed.
ESC05-00927 Tracking Control10/3/200610/24/200610/24/2006 10:27:44 AMACANC
ESC05-01035 Tracking Control10/3/200610/24/200610/24/2006 10:27:20 AMACANC
ESC06-00016 Tracking Control10/3/200610/24/200610/24/2006 10:26:48 AMACANC
ESC06-00016 Tracking Control10/3/200610/24/200610/24/2006 10:26:22 AMAPASS
Site looks good.
ESC05-00704 Site Final10/24/200610/24/200610/24/2006 10:18:36 AMPPASS
Final stabilization has been completed.
ESC06-00665 Tracking Control10/24/200610/24/200610/24/2006 10:17:00 AMPFAIL
verbal c/n to RP, silt fence behind house on slope needs to be repaired, and dumpster is overflowing with trash.
ESC06-00503 Tracking Control10/3/200610/24/200610/24/2006 10:09:44 AMAFAIL
verbal c/n to RP, no ESC sign posted and RP listed on permit is no longer with the company. spoke with new RP and informed him that sign must be posted and that he needs to be added to the permit by the end of the day.
ESC05-01922 Tracking Control10/3/200610/24/200610/24/2006 10:09:21 AMAFAIL
verbal c/n to RP, no ESC sign posted and RP listed on permit is no longer with the company. spoke with new RP and informed him that sign must be posted and that he needs to be added to the permit by the end of the day.
ESC06-00021 Tracking Control10/3/200610/24/200610/24/2006 10:08:52 AMAFAIL
verbal c/n to RP, no ESC sign posted and RP listed on permit is no longer with the company. spoke with new RP and informed him that sign must be posted and that he needs to be added to the permit by the end of the day.
ESC06-00231 Tracking Control10/3/200610/24/200610/24/2006 9:59:26 AMAFAIL
verbal c/n to RP, sheetrock waste needs to be removed and some minimal trackout needs to be addressed. RP informed me that sheetrock will be removed by the end of the week when sheetrocking is complete, and wattles will be replaced and trackout addressed.
ESC05-00931 Tracking Control10/3/200610/24/200610/24/2006 9:43:08 AMAPART
verbal c/n to RP, landscaping is underway. reminded RP to keep an eye on any sediment that may leave site as landscaping is completed.
ESC05-01152 Site Final10/24/200610/24/200610/24/2006 9:38:38 AMPPASS
Final stabilization has been completed.
ESC05-01152 Tracking Control10/3/200610/24/200610/24/2006 9:38:05 AMACANC