Inspections for the day of: Wednesday, October 24, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00576 FIR-Aging Inspection10/24/200710/24/200710/31/2007 6:18:00 AM NR
Work is in progress
FIR07-00850 INSP-Final Inspection10/23/200710/24/200710/24/2007 4:04:07 PMPPASS
Permit finaled
FIR07-00766 INSP-Sprinkler Rough-in10/23/200710/24/200710/24/2007 3:55:49 PMPFAIL
There are still major tenting issues. I went over them with the fire sprinkler contractor and the framer.
BLD05-00633 FIRE-Final Inspection10/24/200710/24/200710/24/2007 3:54:45 PMPPART
The ASU SSU portion of the project is ok to occupy.
FIR06-00011 INSP-Alarm Testing10/24/200710/24/200710/24/2007 3:50:55 PMPDONE
The alarm portion of the ASU SSU has passed per Mike Timmerman.
BLD07-02247 FIRE-Final Inspection10/24/200710/24/200710/24/2007 2:57:33 PMPFAIL
Repair or remove the exit sign
FIR07-00824 INSP-Supply line flush10/24/200710/24/200710/24/2007 2:56:17 PMPFAIL
The inspection was called in for a flush but what was actually needed was a cover inspection for the 8" underground supply. The underground piping is ok to cover.
FIR07-00621 INSP-Final Inspection10/24/200710/24/200710/24/2007 2:41:37 PMPPASS
Life safety passed
FIR07-00163 INSP-Final Inspection10/23/200710/24/200710/24/2007 12:57:04 PMAPASS
Permit finaled
BLD07-02537 FIRE-Final Inspection10/23/200710/24/200710/24/2007 12:17:03 PMAFAIL
Reverse the locking hardware on the door from the reception area to the warehouse. Per ron hill the low walls that are not shown on the plans do not need to be resubmited on unless the structural inspector feels the need. However the builder needs to provide the correct door width and correct hardware. All other items are ok.
FIR06-00869 INSP-Final Inspection10/23/200710/24/200710/24/2007 10:40:01 AMAPASS
Permit finaled