FIR08-00719
| INSP-Final Inspection | 10/24/2008 | 10/24/2008 | 10/24/2008 4:31:46 PM | P | PASS |
|
|
permit finaled
|
BLD08-01516
| FIRE-Final Inspection | 10/24/2008 | 10/24/2008 | 10/24/2008 4:11:30 PM | P | FAIL |
|
|
The thumbturn dead bolt had not been removed and the lever hardware did not unlock in a single motion. The owner became very upset so I left the project and contacted Sam Rogers and Mark Sentenno. The owner met with Sam and Mark met me on the job site. Sam gave the owner, Patty, 10 more days to correct the last two deficiencies.
|
BLD08-01516
| BLD-Final | 10/24/2008 | 10/24/2008 | 10/24/2008 4:08:32 PM | P | CANC |
|
|
Wrong inspection type called in. Need a fire final.
|
FIR08-00541
| INSP-Sprinkler Rough-in | 10/24/2008 | 10/24/2008 | 10/24/2008 2:44:29 PM | P | PASS |
|
|
The overhead sprinkler piping can be covered.
|
BLD08-02040
| FIRE-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 1:52:20 PM | A | FAIL |
|
|
Provide verification that the sprinkler system has had its annual inspection and provide door and approved hardware on the new restroom.
|
BLD08-02041
| FIRE-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 1:51:21 PM | A | FAIL |
|
|
Provide approved single action hardware on one of the main exit doors, provide doors and hardware on the new office and repair the exit sign. Provide verificaiton that the fire sprinkler system has had its annual inspection.
|
FIR08-00657
| INSP-Sprinkler Rough-in/Hydro | 10/23/2008 | 10/24/2008 | 10/24/2008 1:21:31 PM | A | PASS |
|
|
The overhead hydro test for the larger addition passed.
|
FIR08-00697
| INSP-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 10:46:57 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00707
| INSP-Final Inspection | 10/23/2008 | 10/24/2008 | 10/24/2008 10:33:52 AM | A | PASS |
|
|
Permit finaled
|