Inspections for the day of: Friday, October 24, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00719 INSP-Final Inspection10/24/200810/24/200810/24/2008 4:31:46 PMPPASS
permit finaled
BLD08-01516 FIRE-Final Inspection10/24/200810/24/200810/24/2008 4:11:30 PMPFAIL
The thumbturn dead bolt had not been removed and the lever hardware did not unlock in a single motion. The owner became very upset so I left the project and contacted Sam Rogers and Mark Sentenno. The owner met with Sam and Mark met me on the job site. Sam gave the owner, Patty, 10 more days to correct the last two deficiencies.
BLD08-01516 BLD-Final10/24/200810/24/200810/24/2008 4:08:32 PMPCANC
Wrong inspection type called in. Need a fire final.
FIR08-00541 INSP-Sprinkler Rough-in10/24/200810/24/200810/24/2008 2:44:29 PMPPASS
The overhead sprinkler piping can be covered.
BLD08-02040 FIRE-Final Inspection10/23/200810/24/200810/24/2008 1:52:20 PMAFAIL
Provide verification that the sprinkler system has had its annual inspection and provide door and approved hardware on the new restroom.
BLD08-02041 FIRE-Final Inspection10/23/200810/24/200810/24/2008 1:51:21 PMAFAIL
Provide approved single action hardware on one of the main exit doors, provide doors and hardware on the new office and repair the exit sign. Provide verificaiton that the fire sprinkler system has had its annual inspection.
FIR08-00657 INSP-Sprinkler Rough-in/Hydro10/23/200810/24/200810/24/2008 1:21:31 PMAPASS
The overhead hydro test for the larger addition passed.
FIR08-00697 INSP-Final Inspection10/23/200810/24/200810/24/2008 10:46:57 AMAPASS
Permit finaled
FIR08-00707 INSP-Final Inspection10/23/200810/24/200810/24/2008 10:33:52 AMAPASS
Permit finaled