FIR12-00038
| FIR-Aging Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 8:25:57 AM | | DONE |
|
|
|
FIR11-00524
| INSP-Final Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 7:44:13 AM | P | PASS |
|
|
Corrections finished. Fire sprinkler permit finaled.
|
FIR12-00102
| INSP-Final Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 7:25:30 AM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR12-00189
| INSP-Final Inspection | 10/24/2012 | 10/24/2012 | 10/30/2012 7:18:06 AM | P | PASS |
|
|
Coverage below chem trays and ductwork center east to be provided under a separate FIR permit. Per agreement with contractor this work to be completed prior to project related BLD final.
|
FIR12-00335
| FIR-Aging Inspection | 10/24/2012 | 10/24/2012 | 10/29/2012 5:30:00 PM | | DONE |
|
|
Field inspection done 10/29- see permit activities for comments.
|
FIR12-00246
| INSP-Sprinkler Rough-in | 10/24/2012 | 10/24/2012 | 10/24/2012 2:01:32 PM | P | PART |
|
|
Heads at drop ceilings in the east and west wing corridors okay for cover, heads in sheetrock ceilings at the dining area restrooms and soffits completed to date also approved for cover.
|
FIR12-00529
| INSP-Sprinkler Rough-in | 10/24/2012 | 10/24/2012 | 10/24/2012 12:40:40 PM | P | FAIL |
|
|
Overspaced heads at two locations, four open outlets, one end of line at the second floor needs tenting adjusted. See stamped plan set for marked areas.
|
BLD12-00471
| FIRE-Final Inspection | 10/24/2012 | 10/24/2012 | 10/24/2012 11:57:55 AM | P | PASS |
|
|
Correction notice items verified for completion. Max occupant sign to be posted as discussed. Fire life safety finaled.
|