ESC10-00754
| Site Final | 10/23/2012 | 10/24/2012 | 10/25/2012 1:34:11 PM | A | PART |
|
|
work in progress
|
BLD12-01442
| BLD-Final | 10/23/2012 | 10/24/2012 | 10/25/2012 10:37:32 AM | P | PASS |
|
|
Brett-PLease call at least 30 mins prior to inspection for them to meet you for access Phone #: ###-####
|
BLD12-02779
| BLD-Conference | 10/24/2012 | 10/24/2012 | 10/25/2012 9:49:03 AM | P | PASS |
|
|
The roof is ready for final inspection. Phone #: ###-#### >> Inspection requested via web by Michael La Pointe
|
MIS11-00143
| MIS-Aging Inspection | 10/24/2012 | 10/24/2012 | 10/25/2012 9:39:36 AM | | PEND |
|
|
|
BLD12-02678
| BLD-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 4:16:40 PM | P | NR |
|
|
William Phone #: ###-####,, needs f/l/s 1st
|
BLD12-02836
| BLD-Conference | 10/24/2012 | 10/24/2012 | 10/24/2012 4:09:39 PM | P | PASS |
|
|
The roof will be ready for inspection today by 11am. Phone #: ###-#### >> Inspection requested via web by Michael La Pointe//// drysheet ok
|
BLD12-02329
| BLD-Framing/Rough-in | 10/24/2012 | 10/24/2012 | 10/24/2012 4:08:14 PM | P | PASS |
|
|
Paul Phone #: ###-####
|
BLD12-01520
| BLD-Final | 10/24/2012 | 10/24/2012 | 10/24/2012 3:52:05 PM | P | PASS |
|
|
don - call 20 mins prior Phone #: ###-####
|
BLD12-01520
| DOC - Permit Finaled | 10/24/2012 | 10/24/2012 | 10/24/2012 3:51:08 PM | P | PASS |
|
|
|
BLD12-01779
| BLD-Framing/Rough-in | 10/23/2012 | 10/24/2012 | 10/24/2012 2:27:56 PM | P | NR |
|
|
call before//Rodney Phone #: ###-####.,, needs a mech permit and rough in inspection,, conf only
|
BLD12-00424
| BLD-Conference | 10/23/2012 | 10/24/2012 | 10/24/2012 12:36:34 PM | A | PART |
|
|
call ahead to meet//Jeff Phone #: ###-####,, met with Jeff,, he will make the guardrail meet code,, treads on steps between deck meet code and have the engineer of record give letter of ok on tall posts for wind sail/shade
|
BLD12-01520
| BLD-Conference | 10/23/2012 | 10/24/2012 | 10/24/2012 11:44:03 AM | A | PART |
|
|
don - call 20 mins prior Phone #: ###-#### needs a final
|
BLD12-01442
| BLD-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 11:39:44 AM | A | NR |
|
|
Brett--PLease call at least 30 mins prior to inspection for access Phone #: ###-####
|
BLD12-02055
| BLD-Final | 10/23/2012 | 10/24/2012 | 10/24/2012 11:37:08 AM | A | DONE |
|
|
Tim Phone #: ###-####
|
BLD12-02055
| DOC - Permit Finaled | 10/24/2012 | 10/24/2012 | 10/24/2012 10:39:19 AM | P | PASS |
|
|
done gone
|