Inspections for the day of: Wednesday, October 24, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00417 INSP-Sprinkler Rough-in10/24/201210/24/201210/24/2012 3:44:02 PMPPASS
Tenting has been repaired and the batt insulation installed on the vertical rises. Piping can be covered.
FIR12-00394 INSP-Final Inspection10/23/201210/24/201210/24/2012 3:43:11 PMAPASS
permit finaled
BLD12-02678 FIRE-Final Inspection10/23/201210/24/201210/24/2012 12:04:43 PMAFAIL
All items corrected except for the panic hardware at the main exit.
BLD12-01425 FIRE-Final Inspection10/23/201210/24/201210/24/2012 12:02:36 PMAPASS
Life safety passed
BLD12-01803 FIRE-Final Inspection10/23/201210/24/201210/24/2012 11:00:29 AMAPASS
Life safety passed
BLD12-00471 FIRE-Final Inspection10/23/201210/24/201210/24/2012 10:45:12 AMAFAIL
Provide occupant load sign, provide remote annunciator for the duct smoke detector and provide testing for verification of function or remove duct smoke detector since it is not required per IMC 606, mount the fire extinguisher and provide all city approved drawings for inspection.
BLD12-02527 FIRE-Final Inspection10/23/201210/24/201210/24/2012 10:43:04 AMAPASS
Life safety passed. Previous correction items have been addressed.
FIR12-00372 INSP-Final Inspection10/19/201210/24/201210/24/2012 5:55:03 AMAFAIL
Fees due hold on project. I did not know this until I arrived at the project. Since this was set up previously for an after hours inspection, and I was already there at 5am, I went ahead and performed inspection. Permit can be finaled when the fees are taken care of at the permit desk.