FIR12-00417
| INSP-Sprinkler Rough-in | 10/24/2012 | 10/24/2012 | 10/24/2012 3:44:02 PM | P | PASS |
|
|
Tenting has been repaired and the batt insulation installed on the vertical rises. Piping can be covered.
|
FIR12-00394
| INSP-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 3:43:11 PM | A | PASS |
|
|
permit finaled
|
BLD12-02678
| FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 12:04:43 PM | A | FAIL |
|
|
All items corrected except for the panic hardware at the main exit.
|
BLD12-01425
| FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 12:02:36 PM | A | PASS |
|
|
Life safety passed
|
BLD12-01803
| FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 11:00:29 AM | A | PASS |
|
|
Life safety passed
|
BLD12-00471
| FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 10:45:12 AM | A | FAIL |
|
|
Provide occupant load sign, provide remote annunciator for the duct smoke detector and provide testing for verification of function or remove duct smoke detector since it is not required per IMC 606, mount the fire extinguisher and provide all city approved drawings for inspection.
|
BLD12-02527
| FIRE-Final Inspection | 10/23/2012 | 10/24/2012 | 10/24/2012 10:43:04 AM | A | PASS |
|
|
Life safety passed. Previous correction items have been addressed.
|
FIR12-00372
| INSP-Final Inspection | 10/19/2012 | 10/24/2012 | 10/24/2012 5:55:03 AM | A | FAIL |
|
|
Fees due hold on project. I did not know this until I arrived at the project. Since this was set up previously for an after hours inspection, and I was already there at 5am, I went ahead and performed inspection. Permit can be finaled when the fees are taken care of at the permit desk.
|