FIR12-00001
| FIR-Aging Inspection | 10/24/2013 | 10/24/2013 | 10/29/2013 9:31:15 AM | | NR |
|
|
I left voice message for Dave requesting a follow up on the job status.
|
BLD13-02883
| FIRE-Final Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 5:11:03 PM | P | CANC |
|
|
Overbooked but Chris and I discussed general life safety requirements on the phone. Per Chris the phone lines for the fire alarm system are being re-installed. I told him that I would need "certification" that the monitoring had been set up and the system tested prior to a final inspection.
|
BLD12-03121
| FIRE-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 5:08:05 PM | P | PART |
|
|
A temporary occupancy is being given until the fire dept approves the height of the islands
|
BLD13-01052
| FIRE-Final Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 5:05:42 PM | P | CANC |
|
|
Overbooked. Rescheduled for tomorrow
|
BLD13-01918
| FIRE-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 4:28:33 PM | P | FAIL |
|
|
Strobe still has not been corrected yet.
|
FIR13-00275
| INSP-Final Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 3:58:10 PM | P | CANC |
|
|
Overbooked. Rescheduled for tomorrow
|
FIR06-00798
| INSP-Final Inspection | 10/21/2013 | 10/24/2013 | 10/24/2013 3:57:13 PM | A | CANC |
|
|
Overbooked. Per conversation with Jason this will be rescheduled for tomorrow.
|
FIR13-00506
| INSP-Sprinkler Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 3:53:13 PM | P | PASS |
|
|
sprinkler piping is ok to cover
|
BLD13-02718
| FIRE-Final Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 2:47:45 PM | P | PASS |
|
|
life safety passed. Provide sticker, as discussed, at the main exit prior to the building inspection
|
FIR13-00379
| INSP-Sprinkler Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 2:06:35 PM | P | PART |
|
|
Pendant heads are overspaced in three of the below mezzanine offices. Final spacing will be verified at the final inspection. The rough-in passed for the lobby piping (need two branchline restraints) and the second floor piping.
|
FIR13-00362
| INSP-Sprinkler Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 2:04:54 PM | P | PART |
|
|
Pendant sprinkler heads are overspaced in three of the below mezzanine offices. Piping can be covered and the spacing will be verified at the final inspection. Sprinkler rough-in passed in the lobby area and the second floor area.
|
FIR13-00273
| INSP-Supply line flush | 10/24/2013 | 10/24/2013 | 10/24/2013 2:02:39 PM | P | PASS |
|
|
Underground tie-ins on both sides of the building are ok to cover and the underground flush passed.
|
FIR13-00441
| INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 1:57:45 PM | P | PASS |
|
|
Above ground hydro passed
|
FIR13-00342
| INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 1:55:11 PM | P | PASS |
|
|
Overhead hydro passed
|
BLD13-02910
| FIRE-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 12:02:17 PM | A | CANC |
|
|
I left two voice messages for Herb but did not receive a reply. Building inspector said he would verify my items if he could contact tenant. phone #: ###-####
|
FIR13-00529
| INSP-Sprinkler Rough-in | 10/23/2013 | 10/24/2013 | 10/24/2013 11:25:38 AM | A | PASS |
|
|
Sprinkler piping is ok to cover.
|
BLD13-00729
| FIRE-Final Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 9:42:28 AM | P | PASS |
|
|
Life safety passed
|
FIR13-00248
| INSP-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 9:41:03 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00264
| INSP-Sprinkler Rough-in/Hydro | 10/24/2013 | 10/24/2013 | 10/24/2013 9:38:03 AM | A | PART |
|
|
Dry system air test started at 9:30 with 44psi on the guage.
|
FIR13-00386
| INSP-Sprinkler Rough-in | 10/23/2013 | 10/24/2013 | 10/24/2013 8:42:36 AM | A | PASS |
|
|
Piping is ok to cover.
|
FIR13-00498
| INSP-Final Inspection | 10/23/2013 | 10/24/2013 | 10/24/2013 7:57:34 AM | A | FAIL |
|
|
Missing the "request to exit" button at the Print Shop/Stair exterior exit door.
|