BLD13-02227
| BLD-Final | 10/24/2013 | 10/24/2013 | 10/24/2013 4:32:51 PM | P | PASS |
|
|
Demo was approved by BLD inspector. ESC conditions were satisfied with stabilization with planted grass.
|
ESC13-00178
| Aging Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 4:27:21 PM | | PASS |
|
|
Finaled.
|
ESC13-00178
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 4:23:46 PM | P | PASS |
|
|
House complete and landscaped. BLD permit already finaled. ESC conditions met.
|
ESC12-00845
| General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 11:49:12 AM | | PASS |
|
|
WIP. Front yard is has been laid with sod, some stockpiles remain, but no track out and DI bag on MS4 of Warm Springs. Rear construction entrance (for backyard) has been improved. No track out on Villa street.
|
ESC12-01119
| General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 11:33:44 AM | | PASS |
|
|
Finaled.
|
ESC12-01119
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 11:33:29 AM | P | PASS |
|
|
Construction complete, BLD permit already finaled and house is occupied. Homeowner has left straw wattles installed at the toe of slope while vegetation is establishing itself on hillside. Conditions have been met, no further ESC inspections required.
|
ESC13-00284
| Aging Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 11:12:41 AM | | PASS |
|
|
Finaled.
|
ESC13-00284
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 11:12:09 AM | P | PASS |
|
|
House finished, landscaped, and occupied. Other permits (BLD) were already finaled. ESC conditions met.
|
ESC12-00677
| General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 11:04:00 AM | | PASS |
|
|
This is a subdivision permit (south of Hardesty from Wise to Honeycomb . All streets and infrastructure is complete. BMPs still installed for unstabilized sites. Many individual projects are underway.
|
ESC13-00282
| Aging Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 10:39:41 AM | | PASS |
|
|
|
ESC13-00282
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 10:39:24 AM | P | PASS |
|
|
Construction is complete, site is stabilized and landscaped. Trailwind subdivision still has vacant lots, with no stabilization but perimeter BMPs implemented. ESC requirements satisfied
|
ESC13-00332
| Aging Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 10:38:31 AM | | PASS |
|
|
Finaled.
|
ESC13-00332
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 10:33:18 AM | P | PASS |
|
|
Construction is complete, site is stabilized and landscaped. Trailwind subdivision still has vacant lots, with no stabilization but perimeter BMPs. ESC requirements satisfied
|
ESC13-00851
| Site Final | 10/24/2013 | 10/24/2013 | 10/24/2013 10:09:49 AM | A | PASS |
|
|
Finaled.
|
ESC13-00851
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 10:09:27 AM | P | PASS |
|
|
Site final confirmed by Mike Jordan who completed BLD final 10/24
|
ESC13-00780
| General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 9:39:10 AM | | PASS |
|
|
Finaled.
|
ESC13-00780
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 9:38:48 AM | P | PASS |
|
|
ESC conditions met: site stabilized and landscaped. Retaining wall is complete; BLD permit open
|
ESC13-00780
| DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 9:36:19 AM | P | PASS |
|
|
ESC conditions satisfied. Site stabilized and landscaped.
|
ESC12-00212
| General Inspection | 10/24/2013 | 10/24/2013 | 10/24/2013 8:41:45 AM | | PASS |
|
|
|