MEC14-04523
| Final | 10/22/2014 | 10/24/2014 | 10/24/2014 3:46:02 PM | P | PASS |
|
|
installer Scott ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC14-04316
| Rough-in | 10/23/2014 | 10/24/2014 | 10/24/2014 3:28:33 PM | P | FAIL |
|
|
HVAC rough in. Phone #: ###-#### >> Inspection requested via web by Bryan Palmer correction notice posted on furnace
|
MEC14-04589
| Final | 10/23/2014 | 10/24/2014 | 10/24/2014 2:50:00 PM | P | PASS |
|
|
Please Call Dwight ###-#### @ Jims Heating Prior To Inspection Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC14-04203
| Pressure Test | 10/24/2014 | 10/24/2014 | 10/24/2014 2:49:30 PM | P | PASS |
|
|
>> Inspection requested via web by Dan McFate 20# gas test to boiler
|
MEC14-04203
| Final | 10/24/2014 | 10/24/2014 | 10/24/2014 2:49:02 PM | P | PASS |
|
|
>> Inspection requested via web by Dan McFate
|
MEC14-04495
| Final | 10/22/2014 | 10/24/2014 | 10/24/2014 2:14:40 PM | P | PASS |
|
|
Rossen w/TML is requesting 2pm, thank you Phone #: ###-#### >> Inspection requested via web by Michele LaMott
|
MEC14-04599
| Conference | 10/24/2014 | 10/24/2014 | 10/24/2014 2:01:13 PM | P | DONE |
|
|
met with contractor to discuss power venting the appliances
|
MEC14-04595
| Pressure Test | 10/24/2014 | 10/24/2014 | 10/24/2014 12:49:31 PM | P | PASS |
|
|
Call Josh when you are on your way so he can meet you there. ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann 20# test from building to generator pad. This a partial inspection. Still need to inspect gas line from stub underground to building meter
|
MEC14-04646
| Pressure Test | 10/24/2014 | 10/24/2014 | 10/24/2014 12:35:57 PM | P | PASS |
|
|
20# gas line from stub outside pool room to bbq
|
MEC14-04588
| Final | 10/23/2014 | 10/24/2014 | 10/24/2014 10:54:15 AM | A | PASS |
|
|
Please Call Manuel ###-#### @ Jims Heating Prior To Inspection. I Will Meet You At The House Thank You Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
GCM14-00236
| GCM-Final | 10/23/2014 | 10/24/2014 | 10/24/2014 10:53:57 AM | A | PASS |
|
|
Steve ###-####
|
MEC14-04519
| Rough-in | 10/23/2014 | 10/24/2014 | 10/24/2014 9:55:10 AM | A | PASS |
|
|
Troy Phone #: ###-####
|
MEC14-04599
| Conference | 10/23/2014 | 10/24/2014 | 10/24/2014 9:40:57 AM | A | CANC |
|
|
I WOULD LIKE TO MEET UP BETWEEN 10 AND 11 IF POSSIBLE. Phone #: ###-#### >> Inspection requested via web by Doug Turner rescheduled for afternoon
|
MEC14-02735
| Pressure Test | 10/23/2014 | 10/24/2014 | 10/24/2014 9:39:34 AM | A | PASS |
|
|
Pressure Test additional underground gas line. Phone #: ###-#### >> Inspection requested via web by Frank Marturello gas piping to driveway ok 20# test
|
MEC14-04568
| Pressure Test | 10/21/2014 | 10/24/2014 | 10/24/2014 9:38:47 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Konrad Swartz 20# test to gas to future furnace
|
MEC14-03806
| Final | 10/23/2014 | 10/24/2014 | 10/24/2014 9:10:58 AM | A | PASS |
|
|
Luke Phone #: ###-####
|