BLD14-02653
| BLD-Wall Bracing | 10/23/2014 | 10/24/2014 | 1/7/2015 7:13:25 PM | P | CANC |
|
|
David Phone #: ###-#### Inspection cancelled from web by: Dennis Harmon
|
BLD14-02350
| BLD-Footing | 10/22/2014 | 10/24/2014 | 10/24/2014 2:31:52 PM | P | PASS |
|
|
Jim-as early pm as possible pour time 1:30 Phone #: ###-####. interio column pad footings ok.
|
BLD14-02358
| BLD-Final | 10/23/2014 | 10/24/2014 | 10/24/2014 2:06:57 PM | P | PART |
|
|
Jake Phone #: ###-####. ok to open, per frank with CDHD, an inspection is not required due to kitchen was not remodeled. Still needs zonong sign off, inspection is on monday per contractor. All other trades are finaled off, all life/safety is passed. Ok to open this weekend. Contractor will need to follow up for cert. of completion once zoning has finaled.
|
BLD13-00166
| BLD-Conference | 10/17/2014 | 10/24/2014 | 10/24/2014 11:12:59 AM | A | FAIL |
|
|
Check on five day notice. Per the conditions on the five day notice, they have not been met. Called and left a message with the owner stating that he has not met the conditions as discussed last friday on the five day notice. Notices of violation and correction notices have been given to bob archibald.
|
BLD14-01236
| BLD-Final | 10/23/2014 | 10/24/2014 | 10/24/2014 11:10:20 AM | A | PASS |
|
|
Pat Phone #: ###-####. ok for perm occ.
|
BLD14-01510
| BLD-Other | 10/23/2014 | 10/24/2014 | 10/24/2014 11:10:18 AM | A | PASS |
|
|
Pat-RC 1 channel Phone #: ###-####
|
BLD14-02633
| BLD-Framing/Rough-in | 10/23/2014 | 10/24/2014 | 10/24/2014 9:13:49 AM | A | PASS |
|
|
Chad Phone #: ###-####
|
BLD13-00166
| BLD-Other | 10/24/2014 | 10/24/2014 | 10/24/2014 12:00:00 AM | P | PEND |
|
|
Refered to legal dept.
|
BLD14-01236
| BLD-Final | 10/23/2014 | 10/24/2014 | 10/23/2014 12:00:00 AM | A | CANC |
|
|
Pat Phone #: ###-#### // per phone call from Pat, cancel insp, still need zoning
|