Inspections for the day of: Monday, October 24, 2016.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02950 BLD-Footing10/24/201610/24/201610/24/2016 3:26:41 PMPPASS
Jason Phone #: ###-####
BLD16-02951 BLD-Footing10/24/201610/24/201610/24/2016 3:26:16 PMPPASS
Jason Phone #: ###-####
BLD15-01393 BLD-Wall Bracing10/24/201610/24/201610/24/2016 2:18:53 PMPPASS
Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and interior holdowns ok.
BLD16-02719 BLD-Final10/21/201610/24/201610/24/2016 1:33:35 PMPPASS
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
BLD16-02719 DOC - Permit Finaled10/24/201610/24/201610/24/2016 1:33:26 PMPPASS
BLD16-02317 BLD-Footing10/21/201610/24/201610/24/2016 11:22:43 AMANR
Scott-would like as early as possible Phone #: ###-####-please call when on way so Scott can meet. Needs 3 inches of clearance from ground, verts needs to be tied in place, lower footings to be continous and step down. Contractor to have engineer provide details for transition of ICF from lower to upper footings and for step footings.
BLD16-03242 BLD-Concrete10/21/201610/24/201610/24/2016 9:37:04 AMAPART
CMU grout 11 AM Phone #: ###-#### Inspection requested via web by Todd Landvatter. Work in progress on masonry elevator shaft, F.F. to 8ft. elevation, hight lift grout with cleanouts. Verified Letter from engineer of record approving high lift grouting.