BLD16-02950
| BLD-Footing | 10/24/2016 | 10/24/2016 | 10/24/2016 3:26:41 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD16-02951
| BLD-Footing | 10/24/2016 | 10/24/2016 | 10/24/2016 3:26:16 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD15-01393
| BLD-Wall Bracing | 10/24/2016 | 10/24/2016 | 10/24/2016 2:18:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue. Exterior shear walls and interior holdowns ok.
|
BLD16-02719
| BLD-Final | 10/21/2016 | 10/24/2016 | 10/24/2016 1:33:35 PM | P | PASS |
|
|
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
|
BLD16-02719
| DOC - Permit Finaled | 10/24/2016 | 10/24/2016 | 10/24/2016 1:33:26 PM | P | PASS |
|
|
|
BLD16-02317
| BLD-Footing | 10/21/2016 | 10/24/2016 | 10/24/2016 11:22:43 AM | A | NR |
|
|
Scott-would like as early as possible Phone #: ###-####-please call when on way so Scott can meet. Needs 3 inches of clearance from ground, verts needs to be tied in place, lower footings to be continous and step down. Contractor to have engineer provide details for transition of ICF from lower to upper footings and for step footings.
|
BLD16-03242
| BLD-Concrete | 10/21/2016 | 10/24/2016 | 10/24/2016 9:37:04 AM | A | PART |
|
|
CMU grout 11 AM Phone #: ###-#### Inspection requested via web by Todd Landvatter. Work in progress on masonry elevator shaft, F.F. to 8ft. elevation, hight lift grout with cleanouts. Verified Letter from engineer of record approving high lift grouting.
|