ESC16-00697
| General Inspection | 10/20/2016 | 10/24/2016 | 10/26/2016 8:11:44 AM | P | CANC |
|
|
rescheduled 10/26
|
ESC16-00697
| General Inspection | 10/20/2016 | 10/24/2016 | 10/26/2016 8:11:34 AM | P | CANC |
|
|
Construction entrance follow up at Dropzone apartments
rescheduled 10/26
|
ESC16-00013
| General Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 3:07:54 PM | | CANC |
|
|
|
ESC15-01269
| Aging Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 12:07:09 PM | | PASS |
|
|
|
ESC15-01258
| Aging Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 11:58:03 AM | | CANC |
|
|
|
ESC15-00626
| General Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 8:07:46 AM | | PASS |
|
|
Modular relocation within school grounds is complete. Disturbed area stabilized. All permits finaled.
|
ESC15-00306
| General Inspection | 10/24/2016 | 10/24/2016 | 10/25/2016 8:05:51 AM | | CANC |
|
|
|
ESC15-01287
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 1:52:45 PM | | CANC |
|
|
rescheduled for site final
|
ESC15-00557
| Aging Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 1:49:35 PM | | PASS |
|
|
WIP on framing and interior. Sidewak is clean. No trackout to 32nd or from alley. Approved
|
ESC15-01532
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 1:37:51 PM | | PEND |
|
|
Temp BMP DI bags removed on River Street near Riverside Inn as requested.
MS4 inlets on Fairview still has sediment filter bags installed. Correction to remove already issued to Concrete Placing Co. and Boise Parks n Rec...
|
ESC15-00509
| Complaint Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 12:25:41 PM | P | PEND |
|
|
stockpile of gravel, road mix and debris from construction left near HOA trail. HOA complaint
Followed up with Visser Buidling site manager Rick on debris pile remover. Rick stated pile would begin being hauled off this week. Dump truck with get concrete chunks and wood. Landscape crew to removal gravel. This is supposed to occur this week. Will follow up on Friday. Notified HOA contact of schedule
|
ESC16-00941
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 11:21:37 AM | P | PASS |
|
|
WIP on apartment subdivision grading, storm water, and infrastructure. Silt fence perimter installed, no trackout to existing paved parking lot.
Work by landscaping crew for irrigation line re-location is complete and stabilized.
Approved.
|
ESC16-00439
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 11:11:25 AM | A | PASS |
|
|
WIP on subdivsion road, curb, and gutter construction at Bonneville Pointe sub. No significant trackout to Columbia, no fugitive dust. Permit and SWPPP posted. Clearing limits and surronding vegetation preserved. Permit singn and SWPPP info posted at west entrance.
|
ESC14-00206
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 10:57:16 AM | A | PEND |
|
|
All SFHs in Sunnyridge phase 3 are no complete, no current activity or open parcels. Storm drains on Deer Ridge still have DI bags installed and street needs sweeping. Dried concrete washout material has not been hauled away.
Knife River and Hayden Homes not active on site, will monitor and check in with developer on future phases. No immediate corrections.
|
ESC16-00746
| Site Final | 10/24/2016 | 10/24/2016 | 10/24/2016 10:53:04 AM | A | PASS |
|
|
Home complete, landscaped, site cleaned, and temp DI bag on Bend Ridge removed. All permit finaled, no final ESC requests/corrections.
|
ESC16-00528
| Site Final | 10/24/2016 | 10/24/2016 | 10/24/2016 10:51:38 AM | A | PASS |
|
|
Home complete and landscaped. Site cleaned and downstream DI on Bend Ridge has had temp DI bag removed. All permits finaled.
|
ESC16-00816
| DOC - Permit Finaled | 10/24/2016 | 10/24/2016 | 10/24/2016 10:48:04 AM | P | PASS |
|
|
Home complete, occupied, and landscaped. Temp BMP DI bags still in and to be removed by Hayden or Sunnyridge developer under Sunnyridge permit (ESC14-00206)
|
ESC15-00546
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 10:18:39 AM | | PASS |
|
|
WIP on Union Square commercial building. Parking lot complete and used as staging and parking area. Framing occuring.
No trackout, discharges or uncontained trash. No corrections requested.
|
ESC16-00304
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 10:15:38 AM | | PASS |
|
|
No exterior disturbance or staging area on site. BLD still open. No further ESC inspections required, Union Square commercial building and site improvements complete.
|
ESC16-00304
| DOC - Permit Finaled | 10/24/2016 | 10/24/2016 | 10/24/2016 10:14:33 AM | P | PASS |
|
|
|
ESC16-00973
| Site Preparation | 10/21/2016 | 10/24/2016 | 10/24/2016 9:53:56 AM | A | PASS |
|
|
Jesse CA #: ###-####
Onsite meeting with RP Jaron and K2 super-indentant Ty.
Industrial/commercial site with onsite retention. Project duration is < 2 months. DI bag installed to the west of existing stabilized entrance on Targee. Silt fence installed on north boundary to protect drainage/irrigation ditch parallet to I-84. Requested that water truck be available for fugitive dust control as needed. Currently okay w/o. Site has SWPPP for CGP.
Approved for construction. Grading now in progress.
|
ESC15-00033
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 8:45:29 AM | | DEFR |
|
|
to be closed with BLD final if DI bags have been removed.
|
ESC13-00764
| Aging Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 8:44:13 AM | | CANC |
|
|
|
ESC14-01063
| General Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 8:43:47 AM | | CANC |
|
|
|
ESC15-00311
| Aging Inspection | 10/24/2016 | 10/24/2016 | 10/24/2016 8:05:31 AM | | CANC |
|
|
|