Inspections for the day of: Monday, October 24, 2016.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00697 General Inspection10/20/201610/24/201610/26/2016 8:11:44 AMPCANC

rescheduled 10/26
ESC16-00697 General Inspection10/20/201610/24/201610/26/2016 8:11:34 AMPCANC
Construction entrance follow up at Dropzone apartments

rescheduled 10/26
ESC16-00013 General Inspection10/24/201610/24/201610/25/2016 3:07:54 PM CANC
ESC15-01269 Aging Inspection10/24/201610/24/201610/25/2016 12:07:09 PM PASS
ESC15-01258 Aging Inspection10/24/201610/24/201610/25/2016 11:58:03 AM CANC
ESC15-00626 General Inspection10/24/201610/24/201610/25/2016 8:07:46 AM PASS
Modular relocation within school grounds is complete. Disturbed area stabilized. All permits finaled.
ESC15-00306 General Inspection10/24/201610/24/201610/25/2016 8:05:51 AM CANC
ESC15-01287 General Inspection10/24/201610/24/201610/24/2016 1:52:45 PM CANC
rescheduled for site final
ESC15-00557 Aging Inspection10/24/201610/24/201610/24/2016 1:49:35 PM PASS
WIP on framing and interior. Sidewak is clean. No trackout to 32nd or from alley. Approved
ESC15-01532 General Inspection10/24/201610/24/201610/24/2016 1:37:51 PM PEND
Temp BMP DI bags removed on River Street near Riverside Inn as requested.

MS4 inlets on Fairview still has sediment filter bags installed. Correction to remove already issued to Concrete Placing Co. and Boise Parks n Rec...
ESC15-00509 Complaint Inspection10/24/201610/24/201610/24/2016 12:25:41 PMPPEND
stockpile of gravel, road mix and debris from construction left near HOA trail. HOA complaint

Followed up with Visser Buidling site manager Rick on debris pile remover. Rick stated pile would begin being hauled off this week. Dump truck with get concrete chunks and wood. Landscape crew to removal gravel. This is supposed to occur this week. Will follow up on Friday. Notified HOA contact of schedule
ESC16-00941 General Inspection10/24/201610/24/201610/24/2016 11:21:37 AMPPASS
WIP on apartment subdivision grading, storm water, and infrastructure. Silt fence perimter installed, no trackout to existing paved parking lot.

Work by landscaping crew for irrigation line re-location is complete and stabilized.

Approved.
ESC16-00439 General Inspection10/24/201610/24/201610/24/2016 11:11:25 AMAPASS
WIP on subdivsion road, curb, and gutter construction at Bonneville Pointe sub. No significant trackout to Columbia, no fugitive dust. Permit and SWPPP posted. Clearing limits and surronding vegetation preserved. Permit singn and SWPPP info posted at west entrance.
ESC14-00206 General Inspection10/24/201610/24/201610/24/2016 10:57:16 AMAPEND
All SFHs in Sunnyridge phase 3 are no complete, no current activity or open parcels. Storm drains on Deer Ridge still have DI bags installed and street needs sweeping. Dried concrete washout material has not been hauled away.

Knife River and Hayden Homes not active on site, will monitor and check in with developer on future phases. No immediate corrections.
ESC16-00746 Site Final10/24/201610/24/201610/24/2016 10:53:04 AMAPASS
Home complete, landscaped, site cleaned, and temp DI bag on Bend Ridge removed. All permit finaled, no final ESC requests/corrections.
ESC16-00528 Site Final10/24/201610/24/201610/24/2016 10:51:38 AMAPASS
Home complete and landscaped. Site cleaned and downstream DI on Bend Ridge has had temp DI bag removed. All permits finaled.
ESC16-00816 DOC - Permit Finaled10/24/201610/24/201610/24/2016 10:48:04 AMPPASS
Home complete, occupied, and landscaped. Temp BMP DI bags still in and to be removed by Hayden or Sunnyridge developer under Sunnyridge permit (ESC14-00206)
ESC15-00546 General Inspection10/24/201610/24/201610/24/2016 10:18:39 AM PASS
WIP on Union Square commercial building. Parking lot complete and used as staging and parking area. Framing occuring.

No trackout, discharges or uncontained trash. No corrections requested.
ESC16-00304 General Inspection10/24/201610/24/201610/24/2016 10:15:38 AM PASS
No exterior disturbance or staging area on site. BLD still open. No further ESC inspections required, Union Square commercial building and site improvements complete.
ESC16-00304 DOC - Permit Finaled10/24/201610/24/201610/24/2016 10:14:33 AMPPASS
ESC16-00973 Site Preparation10/21/201610/24/201610/24/2016 9:53:56 AMAPASS
Jesse CA #: ###-####

Onsite meeting with RP Jaron and K2 super-indentant Ty.

Industrial/commercial site with onsite retention. Project duration is < 2 months. DI bag installed to the west of existing stabilized entrance on Targee. Silt fence installed on north boundary to protect drainage/irrigation ditch parallet to I-84. Requested that water truck be available for fugitive dust control as needed. Currently okay w/o. Site has SWPPP for CGP.

Approved for construction. Grading now in progress.
ESC15-00033 General Inspection10/24/201610/24/201610/24/2016 8:45:29 AM DEFR
to be closed with BLD final if DI bags have been removed.
ESC13-00764 Aging Inspection10/24/201610/24/201610/24/2016 8:44:13 AM CANC
ESC14-01063 General Inspection10/24/201610/24/201610/24/2016 8:43:47 AM CANC
ESC15-00311 Aging Inspection10/24/201610/24/201610/24/2016 8:05:31 AM CANC